Inspections for the day of: Monday, May 12, 2003.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00167 INSP-Final Inspection5/8/20035/12/20035/12/2003 8:21:11 AMPCANC
Scheduled by a contractor via Hello! on 5/8/2003 at 8:04:28 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 12 2003 8:21AM.
FIR03-00041 FIR-Aging Inspection5/12/20035/12/20035/12/2003 12:00:00 AM PART
this building is still undewr construction and almost ready for final 5/12/2003 7:37:06 AM
FIR03-00142 INSP-Sprinkler Rough-in/Hydro5/12/20035/12/20035/12/2003 12:00:00 AMPNH
Scheduled by a contractor via Hello! on 5/12/2003 at 11:24:40 AM. arrived at 4:30 and all of the doors were locked; couldn't gain entry 5/12/2003 4:31:36 PM
PLM03-01298 Other5/12/20035/12/20035/12/2003 12:00:00 AMPPART
received call from Sam Rogers and Bill V. about fire sprinkler UG work by unlicensed contractor; called and Rob and he told me to talk to his boss, Doug. Informed Doug that fire sprinkler work must be by licensed contractor and he said he is getting Treasure Valley FP to get a permit for this work; told Doug not to install any fire service
FIR03-00029 INSP-Alarm Testing5/9/20035/12/20035/12/2003 12:00:00 AMPFAIL
audible alarms in mechanical rooms; smoke/fire dampers aren't when AHU's are in fault; tested notification in all areas - okay; 5/12/2003 4:35:54 PM