BLD03-00251
| FIRE-Final Inspection | 5/8/2003 | 5/12/2003 | 5/12/2003 12:00:00 AM | A | FAIL |
|
|
###-#### Paint curbing for the fire lane per review note #3 and drawing G101. Provide "Door to remain unlocked during business hours" at the main entry/exit. Remove manual flush bosts from the main entry/exit. See IFC 1003.3.1.8.1. Remove thumbturn from the west door. Provide one additinal emergency light at the west door in the corridor. Test other emergency light in the same corridor. 5/12/2003 8:59:24 AM
|
FIR03-00175
| INSP-Sprinkler Rough-in/Hydro | 5/11/2003 | 5/12/2003 | 5/12/2003 12:00:00 AM | P | FAIL |
|
|
Hangers and sway bracing have been corrected but no insulation has been added yet. Per the contractor the insulation will be completed tomorrow and an inspection called in. 5/12/2003 4:00:19 PM
|
FIR02-00316
| INSP-Final Inspection | 5/12/2003 | 5/12/2003 | 5/12/2003 12:00:00 AM | P | PASS |
|
|
Retest the hood for light and recepticle shutdown. Provide panel keys for knox box. Provide map for facp. Provide room numbers on map. Lounge 130 pull station is mis labeled. Verify signals with fax 5/12/2003 3:23:41 PM
|
BLD03-00483
| FIRE-Final Inspection | 5/12/2003 | 5/12/2003 | 5/12/2003 12:00:00 AM | P | FAIL |
|
|
Duct smoke detector came in at the fire alarm panel but did not shutdown the hvac unit or activate the remote alarm led 5/12/2003 3:25:23 PM
|
FIR03-00223
| INSP-Final Inspection | 5/12/2003 | 5/12/2003 | 5/12/2003 12:00:00 AM | P | PASS |
|
|
|
FIR02-00423
| INSP-Final Inspection | 5/12/2003 | 5/12/2003 | 5/12/2003 12:00:00 AM | P | PASS |
|
|
|