Inspections for the day of: Monday, May 12, 2008.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02677 BLD-Aging Inspection5/12/20085/12/20085/13/2008 4:59:05 PM DEFR
to fir
BLD06-01538 BLD-Final5/12/20085/12/20085/12/2008 5:09:48 PMPDEFR
pat Phone #: ###-#### rolled over out of time.
BLD07-03136 BLD-Energy code compliance5/12/20085/12/20085/12/2008 5:04:44 PMPNR
dan Phone #: ###-####
BLD07-03012 BLD-Final5/9/20085/12/20085/12/2008 4:31:29 PMPPASS
jeff - please call for access Phone #: ###-#### temp ok pending plm temp/
ESC08-00148 Random Inspection5/12/20085/12/20085/12/2008 11:43:28 AMAPASS
Drop inlet is protected genral conformance achived.
BLD08-00413 BLD-Foundation5/12/20085/12/20085/12/2008 11:40:15 AMAPASS
Scheduled by a contractor via Hello! on 5/12/2008 at 6:56:06 AM. Contact: ###-####.
BLD08-00080 BLD-Energy code compliance5/9/20085/12/20085/12/2008 11:09:57 AMAPASS
bill - please call 1/2 hr prior to inspection Phone #: ###-####
BLD07-02112 BLD-Framing/Rough-in5/8/20085/12/20085/12/2008 10:39:09 AMAPART
mitch Phone #: ###-#### rfi to engineer for sheer wall edge blk or not for screw sch./ verrifcation of pin only for sheer wall interior shot pin only/ bolts still need tightened before 2 nd floor concrete is to be placed/
ESC07-00999 Random Inspection5/12/20085/12/20085/12/2008 10:35:58 AMAPASS
genral conformance being maintaned.
ESC08-00002 Random Inspection5/12/20085/12/20085/12/2008 9:57:26 AMAPASS
genral conformance maintaned.
BLD08-00011 BLD-Framing/Rough-in5/9/20085/12/20085/12/2008 9:56:44 AMAPASS
vince Phone #: ###-#### need backing for verital grab bars in restrooms. ok to insulate.
BLD08-00758 BLD-Framing/Rough-in5/12/20085/12/20085/12/2008 9:14:21 AMPCANC
jeff Phone #: ###-####