BLD08-00883
| BLD-Framing/Rough-in | 5/12/2008 | 5/12/2008 | 5/12/2008 5:18:09 PM | P | PASS |
|
|
don Phone #: ###-#### Frame and Energy OK
|
BLD08-00113
| BLD-Framing/Rough-in | 5/12/2008 | 5/12/2008 | 5/12/2008 4:18:07 PM | P | PASS |
|
|
rob Phone #: ###-####
|
BLD08-00874
| BLD-Conference | 5/12/2008 | 5/12/2008 | 5/12/2008 3:50:09 PM | P | DONE |
|
|
RP not on site....Talked to Contractor (Nancy)......Sign moved to front.....street swept....Drain inlet filter ordered......Weather dry....no rain forecast for several days.
|
BLD08-00564
| BLD-Framing/Rough-in | 5/12/2008 | 5/12/2008 | 5/12/2008 3:23:39 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/12/2008 at 8:28:46 AM. Contact: ###-####. Frame and Energy OK
|
BLD08-00696
| BLD-Framing/Rough-in | 5/12/2008 | 5/12/2008 | 5/12/2008 3:00:25 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/12/2008 at 10:57:25 AM. Contact: ###-####.
|
BLD08-00691
| BLD-Concrete | 5/9/2008 | 5/12/2008 | 5/12/2008 11:36:53 AM | A | PART |
|
|
tony Phone #: ###-#### Partial wall insp.....OK
|
ESC08-00371
| Site Preparation | 5/12/2008 | 5/12/2008 | 5/12/2008 10:06:30 AM | A | DONE |
|
|
Talked to RP and Contractor.....Need to Place sign in a place visible from street...Need to sweep street.....and install drain inlet protection. Will check at foundation inspection.
|
BLD08-00874
| BLD-Footing | 5/12/2008 | 5/12/2008 | 5/12/2008 10:04:51 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 5/12/2008 at 7:21:12 AM. Contact: ###-####.
|