PLM09-00687
| Water and/or Sewer | 5/11/2009 | 5/12/2009 | 5/12/2009 3:37:32 PM | P | PART |
|
|
colby Phone #: ###-#### interceptor ok to cover
|
PLM08-02749
| Groundwork | 5/12/2009 | 5/12/2009 | 5/12/2009 3:36:55 PM | P | NR |
|
|
This is for the dispacth maint. Please call Steve with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel wrong permit number for disp & main. building. partial waste test and waste main relocation ok.
|
PLM09-00522
| Final | 5/12/2009 | 5/12/2009 | 5/12/2009 3:35:48 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/12/2009 at 8:51:07 AM. Contact: ###-####. final shell prior to T.I. final, thermol expansion protection required. air gap required on T&P drain.
|
PLM09-00694
| Final | 5/12/2009 | 5/12/2009 | 5/12/2009 1:24:17 PM | P | PASS |
|
|
Craig ###-#### RI, FINAL OK WITH MOP SINK SECURED.
|
PLM09-00417
| Final | 5/12/2009 | 5/12/2009 | 5/12/2009 10:43:07 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 5/12/2009 at 7:25:10 AM. Contact: ###-####. final ok with air gaps an the grease trap waste and the three compartment sink waste.
|
ESC09-00210
| General Inspection | 5/8/2009 | 5/12/2009 | 5/12/2009 10:10:55 AM | A | PART |
|
|
reinspection called rp about sweeping hard surfaces, picking up all debris, posting wash out.
|
PLM09-00307
| PLM-Aging Inspection | 5/12/2009 | 5/12/2009 | 5/12/2009 8:59:20 AM | | PART |
|
|
needs testing
|
PLM09-00307
| Sprinkler (Final) | 5/12/2009 | 5/12/2009 | 5/12/2009 8:58:54 AM | A | FAIL |
|
|
needs testing
|
PLM09-00307
| Sprinkler (Final) | 5/12/2009 | 5/12/2009 | 5/12/2009 8:58:20 AM | A | CANC |
|
|
|
BLD09-00168
| BLD-Other | 5/12/2009 | 5/12/2009 | 5/12/2009 12:00:00 AM | P | PASS |
|
|
Permit Issued-STOP WORK REMOVED- per Bill VanDeGrift.
ajb
|