ESC08-00577
| General Inspection | 5/12/2009 | 5/12/2009 | 5/12/2009 5:03:57 PM | P | PASS |
|
|
sign posted site looks fine
|
ELE09-00092
| Electrical Rough-In | 5/12/2009 | 5/12/2009 | 5/12/2009 5:03:28 PM | P | PASS |
|
|
eric Phone #: ###-#### ok cover floor heat master bath rm.
|
ELE09-00376
| Final | 5/12/2009 | 5/12/2009 | 5/12/2009 2:06:52 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/12/2009 at 8:45:14 AM. Contact: ###-####. ok final
|
ELE09-00701
| Final | 5/11/2009 | 5/12/2009 | 5/12/2009 11:42:42 AM | A | PASS |
|
|
Bank does not open till 9AM Phone #: ###-#### Internet Inspection Request from: Therrin Robertson ok final note no esc permit in project
|