ESC09-00214
| Site Preparation | 5/12/2009 | 5/12/2009 | 5/12/2009 3:21:57 PM | P | PASS |
|
|
ESC permit sign posted. Determined no washout needed due to size of job and conc. being mixed by volumetric method.
|
BLD09-00594
| BLD-Footing | 5/12/2009 | 5/12/2009 | 5/12/2009 3:20:50 PM | P | PASS |
|
|
Travis Phone #: ###-####
|
BLD08-01321
| BLD-Final | 5/12/2009 | 5/12/2009 | 5/12/2009 2:14:09 PM | P | PASS |
|
|
joe - around 1 please Phone #: ###-####. Ok for perm occ.
|
BLD09-00481
| BLD-Framing/Rough-in | 5/12/2009 | 5/12/2009 | 5/12/2009 10:29:54 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 5/12/2009 at 7:29:14 AM. Contact: ###-####. All additional bolts for sill plate have been installed. ok.
|
ESC09-00029
| Site Preparation | 5/12/2009 | 5/12/2009 | 5/12/2009 10:02:47 AM | A | CANC |
|
|
|
ESC09-00029
| Random Inspection | 5/12/2009 | 5/12/2009 | 5/12/2009 10:02:41 AM | A | PART |
|
|
Conc. washout will be in container until permanent one is provided. Needs to provide waddels around excavated materials.
|
BLD09-00109
| BLD-Other | 5/11/2009 | 5/12/2009 | 5/12/2009 10:00:25 AM | A | DONE |
|
|
Herry Phone #: ###-####. Will have special insp. Noted some changes in rebar, check rfi. Will recall footing insp when ready. Also noted bottom of footing has been approved by special insp. agency.
|