ESC09-00352
| General Inspection | 5/12/2010 | 5/12/2010 | 5/12/2010 2:49:56 PM | P | PART |
|
|
Main park area: Overall site looks ok, lots of area exposed and it's up to the contractor to determine if the existing conditions meet CGP regarding final stabilization. Work continuing to be worked on the north side of Wellings Creek. Willows along the river continue to have new growth. Minimal grass observed between the willows. No signs of areas where in normal rain event conditions that turbid discharge could occur.
|
ESC09-00352
| General Inspection | 5/12/2010 | 5/12/2010 | 5/12/2010 1:46:53 PM | P | PART |
|
|
Ped. bridge area: Verbal to RP, Sediment barriers needed in misc. locations both north and south of new bridge box culvert. Turbidity curtain remains downstream across Wellings Creek. Work to connect new spur of the Greeen Belt with the existing Green Belt is scheduled for the week of May 24th. Access road south of the Ped. Bridge is being constructed currently.
|
ESC10-00307
| General Inspection | 5/12/2010 | 5/12/2010 | 5/12/2010 1:43:00 PM | P | PASS |
|
|
Building debris has been removed from the site except concrete foundation, contractor working removal of the foundation during inspection. Sign posted.
|
ESC10-00312
| Site Preparation | 5/12/2010 | 5/12/2010 | 5/12/2010 7:55:10 AM | | CANC |
|
|
Inspection passed by inspector 330 on 5/10/10
|
ESC10-00377
| Site Preparation | 5/12/2010 | 5/12/2010 | 5/12/2010 7:54:40 AM | | CANC |
|
|
Inspection passed by inspector 415 on 5/10/10
|
ESC10-00323
| Site Preparation | 5/12/2010 | 5/12/2010 | 5/12/2010 7:54:06 AM | | CANC |
|
|
Inspection passed by inspector 330 on 5/10/10
|