Inspections for the day of: Wednesday, May 12, 2010.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-00661 FIRE-Conference5/12/20105/12/20105/12/2010 3:37:43 PMPDONE
This conference was for fire sprinkler issues. It appears sprinkler protection is ok except for an existing sprinkler head that should have been demo'd with the old ceiling. This work will require a permit.
FIR10-00060 INSP-Alarm Testing5/11/20105/12/20105/12/2010 3:10:57 PMPFAIL
Todays inspection was for the five rooms at the pool area. They include locker/showers and restrooms. The visual coverage is inadequate due to alot of shadowing. It appears that atleast seven additional strobes are going to be required. EOL will need to be verified on this circuit when the fire alarm system installation has been completed.
FIR10-00212 INSP-Final Inspection5/11/20105/12/20105/12/2010 3:07:30 PMPCANC
Cancel per telephone call from morgan Phone #: ###-####
BLD10-00875 FIRE-Final Inspection5/11/20105/12/20105/12/2010 3:07:03 PMAFAIL
I stopped by the project site and spoke to Jack. There is no word back from the mall on the monitoring account being set up.
FIR05-00727 FIR-Aging Inspection5/12/20105/12/20105/12/2010 11:49:35 AM NR
Contractor is following up on the alarm interconnection. A follow up inspection has been scheduled for next week.
FIR06-00155 INSP-Final Inspection5/12/20105/12/20105/12/2010 10:56:37 AMPPASS
Permit finaled
FIR10-00117 INSP-Sprinkler Rough-in5/11/20105/12/20105/12/2010 9:32:52 AMAPASS
The remaining sprinkler piping can be covered.
FIR00-00501 INSP-Final Inspection5/7/20105/12/20105/12/2010 9:31:56 AMAPASS
Permit finaled
FIR10-00032 INSP-Sprinkler Rough-in5/11/20105/12/20105/12/2010 8:36:39 AMAPASS
The phase 2 sprinkler piping is ok to cover.
FIR06-00155 FIR-Aging Inspection5/12/20105/12/20105/12/2010 7:29:03 AM PASS