Inspections for the day of: Thursday, May 12, 2011.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE10-02677 ELE-Aging Inspection5/12/20115/12/20115/16/2011 4:02:09 PM DONE
still under construction
ELE10-02328 ELE-Aging Inspection5/12/20115/12/20115/16/2011 9:30:29 AM DONE
still under construction, at sheet rock stage5/16/11
ELE10-02769 ELE-Aging Inspection5/12/20115/12/20115/16/2011 9:25:50 AM DONE
still under struction
ELE10-02779 ELE-Aging Inspection5/12/20115/12/20115/13/2011 3:57:13 PM DONE
still under construction
ESC10-00761 General Inspection5/12/20115/12/20115/13/2011 3:52:54 PM DONE
site in clean, job still under construction
ELE11-00777 Final5/11/20115/12/20115/12/2011 3:49:21 PMPPASS
Please call Stephanie, she will meet you there. Thank You. Phone #: ###-#### >> Inspection requested via web by Clay Morgan final ok
ELE11-00432 Rough-In Permanent Service5/12/20115/12/20115/12/2011 3:08:35 PMPFAIL
Cory-Please call at least 30 mins prior to inspection Phone #: ###-#### NEC 413.16 box fill correction still exist.
ELE11-00672 Electrical Rough-In5/11/20115/12/20115/12/2011 2:15:52 PMPPASS
wall cover Phone #: ###-#### >> Inspection requested via web by Tyler Bowen rough-in ok cover walls
ELE11-00574 Final5/12/20115/12/20115/12/2011 1:51:06 PMPPASS
Mark-Please call at least 30 mins prior to inspection Phone #: ###-#### final ok
ELE11-00964 Rough-In Permanent Service5/12/20115/12/20115/12/2011 1:31:45 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Dan Rohl rough in p/s u/g n ok
ELE11-00949 Electrical Rough-In5/11/20115/12/20115/12/2011 12:10:11 PMAPASS
Doors will be unlocked. This is Suite 100 Phone #: ###-#### >> Inspection requested via web by Paula Gratiot rough-in ok cover walls
ELE11-00952 Temporary Service5/11/20115/12/20115/12/2011 11:48:33 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Alan Lusk t/s u/g ok transformer
GCE11-00052 GCE-Courtesy5/11/20115/12/20115/12/2011 11:08:34 AMADONE
Preliminary ConferenceHank @ ###-####Call in advance discussed with hank-electrican service explansion for new addition, grounding. job trailor temp. power. electrical permit required on job trailor temp. power
ELE11-00853 Final5/11/20115/12/20115/12/2011 10:38:02 AMAPASS
Both lights are installed.... Phone #: ###-#### >> Inspection requested via web by Kevin Burke final ok
ELE11-00575 Final5/11/20115/12/20115/12/2011 10:27:02 AMAPASS
>> Inspection requested via web by Stephanie White final ok UL listed tags
ELE11-00940 Temporary Service5/12/20115/12/20115/12/2011 10:23:18 AMPPASS
Phone #: ###-#### >> Inspection requested via web by Kathy Smith t/s u/g ok
ELE11-00946 Final5/12/20115/12/20115/12/2011 10:20:24 AMAPASS
final ok listed generator-listed transfer switch
ELE11-00946 Electrical Rough-In5/11/20115/12/20115/12/2011 10:18:52 AMAPASS
Generator has been set today (Wed). We will be making a few terms in the morning but otherwise ready for inspection. Call Loren in AM to meet and escort into Boise Zoo. Meet on North side of zoo where 3rd St. comes into park by swan rental pond place.Small parking lot there to park in. Thanks! Phone #: ###-#### >> Inspection requested via web by Loren Ramsey rough-in ok listed equipment
ELE11-00942 Rough-In Permanent Service5/11/20115/12/20115/12/2011 9:48:37 AMANR
eric- around 11 if possible please Phone #: ###-####
ELE11-00942 Permanent Service5/12/20115/12/20115/12/2011 9:47:54 AMPPASS
p/s o/h rec ok
ELE11-00953 Temporary Service5/11/20115/12/20115/12/2011 9:13:00 AMAPASS
pat Phone #: ###-#### t/p/ o/h ok
ELE11-00926 Rough-In Permanent Service5/12/20115/12/20115/12/2011 8:58:27 AMAPASS
THANKS, BOB Phone #: ###-#### >> Inspection requested via web by Bob Glenn rough-in p/s u/g ok
ELE11-00554 Final5/11/20115/12/20115/12/2011 8:38:16 AMAPASS
General contractor will be onsite. His name is Jason Werre,With Foothills Construction. His contact phone number is ###-####. There is also a lockbox on the side of the garage if needed. The combo is 595. Thanks Todd (Owyhee Elecric) Phone #: ###-#### >> Inspection requested via web by todd cline final ok
ELE11-00957 Electrical Rough-In5/11/20115/12/20115/12/2011 8:18:02 AMAPASS
ug insp//paul Phone #: ###-#### rough-in ok cover trench
ELE11-00945 Temporary Service5/11/20115/12/20115/12/2011 7:36:55 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Alan Lusk t/p u/g transformer ok
ELE11-00950 Temporary Service5/11/20115/12/20115/12/2011 7:31:41 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Alan Lusk t/s u/g ok
ELE11-00945 Final5/11/20115/12/20115/11/2011 12:56:46 PMACANC
Phone #: ###-#### >> Inspection requested via web by Alan Lusk Inspection cancelled from web by: Alan Lusk