FIR12-00717
| INSP-Sprinkler Rough-in | 5/12/2014 | 5/12/2014 | 5/13/2014 9:44:19 AM | P | PASS |
|
|
See the city approved plans for additional areas where piping is ok to cover.
|
FIR13-00723
| INSP-Sprinkler Rough-in | 5/12/2014 | 5/12/2014 | 5/12/2014 3:13:12 PM | P | PASS |
|
|
See the city approved plans for locations where piping above hardlids can be covered in the basement and first floors. Overhead piping rough-in passed in these two areas as well but another cover inspection will be needed once the drops are installed.
|
BLD14-00873
| FIRE-Final Inspection | 5/12/2014 | 5/12/2014 | 5/12/2014 2:31:40 PM | P | FAIL |
|
|
Repair the exit discharge light and provide single action/lever hardware on the doors as per the door scheduled.
|
BLD14-00329
| FIRE-Final Inspection | 5/12/2014 | 5/12/2014 | 5/12/2014 1:38:22 PM | P | FAIL |
|
|
Provide the two exit signs as discussed and shown on the approved plans.
|
FIR14-00240
| INSP-Sprinkler Rough-in | 5/9/2014 | 5/12/2014 | 5/12/2014 10:27:18 AM | A | PASS |
|
|
See the city approved plans for the phase/location where sprinkler piping is ok to cover marked with todays dat.
|
BLD13-02644
| FIRE-Final Inspection | 5/9/2014 | 5/12/2014 | 5/12/2014 9:54:26 AM | A | PASS |
|
|
life safety passed
|
BLD14-01073
| FIRE-Final Inspection | 5/8/2014 | 5/12/2014 | 5/12/2014 8:54:47 AM | A | PASS |
|
|
life safety passed
|