Inspections for the day of: Monday, May 12, 2014.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00593 Aging Inspection5/12/20145/12/20145/12/2014 3:34:47 PM PASS
Finaled. See notes.
ESC13-00593 DOC - Permit Finaled5/12/20145/12/20145/12/2014 3:34:24 PMPPASS
No construction activitiy or ESC violations observed. No activity on permit since September 2013 (over 180 days ) Permit expired.
ESC13-00070 General Inspection5/12/20145/12/20145/12/2014 3:26:21 PM PASS
ESC13-00071 General Inspection5/12/20145/12/20145/12/2014 3:26:02 PM PASS
ESC13-00072 General Inspection5/12/20145/12/20145/12/2014 3:25:35 PM PASS
Terraces stabilizaed construction access Council Springs are in good condition. Duplex site is within main site. No corrections at this time.
ESC13-00975 Site Preparation5/12/20145/12/20145/12/2014 3:15:42 PMPCANC
Clint Phone #: ###-####

Permit posted. Triplett Sub BMPs in good condition. Approved.
ESC13-00232 General Inspection5/12/20145/12/20145/12/2014 2:55:43 PM PASS
House is complete and listed for sale, BLD permit has not been finaled. Construction waste container is still on site. Perimeter outside of lot is compacted but not vegetated. No erosion issues observed.
ESC13-01263 Conference5/8/20145/12/20145/12/2014 11:50:25 AMAPASS
Check back on the status of the berms that are not stabilized.

Talked with CM foreman Ross Tucker ####-#### regarding temporary stabilization of the berms. BK is working on getting funding to have it landscaped soon. In the meanwhile, Ross and Bob Berryman of Central Paving will look into temporary stabilization of the berms. The berms around the tennis court are being construct and are in the ESC plan to be hydroseeded for dust and erosion control.

Will continue to monitor, but no violations observed on site today and minimal dust being kicked up by the wind.
ESC13-00481 General Inspection5/9/20145/12/20145/12/2014 11:30:28 AMAPASS
BLD permit has been finaled. Some temporary BMPs are still in place as final landscaping is finishing up. Some construction materials still remain in the staging area as well. No trackout or other violations observed. Will check to see if any corrections/status on next general inspection.
ESC12-00912 General Inspection5/12/20145/12/20145/12/2014 10:43:29 AM PASS
Homeowner RP. Work ongoing. No corrections required at this time.
ESC13-01113 General Inspection5/9/20145/12/20145/12/2014 10:07:46 AMPPASS
Finaled. See activity notes for details.
ESC13-01113 DOC - Permit Finaled5/12/20145/12/20145/12/2014 10:07:22 AMPPASS
Pool is installed and no further construction. Remaining ESC corrections and stabilization of the site will be covered under the house permit ESC13-00213 (BLD13-00042)
ESC13-00213 General Inspection5/12/20145/12/20145/12/2014 9:48:57 AMPPART
Need to sweep up concrete waste from the recent work on the new drainage structure and sidewalk. No other violations. Contacted Dave Hicks. Parcel has a hold for plan resubmittals and also permited under ESC13-01113
ESC12-01100 General Inspection5/12/20145/12/20145/12/2014 8:37:11 AM PASS
Project is in final stages of completion. House is done, but landscaping and further slope stabilization/vegetation is needed. No corrections at this time.