BLD15-00128
| BLD-Foundation | 5/12/2015 | 5/12/2015 | 5/12/2015 3:28:30 PM | P | PART |
|
|
CMU, pour time 2:00PM; Tony Phone #: ###-####. masonry wall on gridline 1.3, top of footong to finish floor elevation. Work in progress, special inspector on site.
|
BLD15-00080
| BLD-Final | 5/11/2015 | 5/12/2015 | 5/12/2015 2:41:59 PM | P | NR |
|
|
Mike Phone #: ###-####
|
BLD15-00520
| BLD-Final | 5/12/2015 | 5/12/2015 | 5/12/2015 1:33:47 PM | P | DONE |
|
|
Ken Phone #: ###-####
|
BLD15-00520
| DOC - Permit Finaled | 5/12/2015 | 5/12/2015 | 5/12/2015 1:32:53 PM | P | PASS |
|
|
|
BLD15-00251
| BLD-Final | 5/11/2015 | 5/12/2015 | 5/12/2015 10:31:12 AM | A | NR |
|
|
Andrea Phone #: ###-####. Site not stabalized. Called and spoke to andrea and noted that permit could not be finaled until site is stabalized per the ESC conditions.
|
BLD14-02107
| BLD-Final | 5/11/2015 | 5/12/2015 | 5/12/2015 9:53:08 AM | A | PASS |
|
|
Anita Phone #: ###-####. Ok for perm occ.
|
BLD15-00931
| BLD-Wall Bracing | 5/11/2015 | 5/12/2015 | 5/12/2015 9:24:36 AM | A | PASS |
|
|
Josh Phone #: ###-####
|
BLD13-03589
| BLD-Energy code compliance | 5/11/2015 | 5/12/2015 | 5/12/2015 9:17:10 AM | A | PASS |
|
|
insulation inspection Phone #: ###-#### Inspection requested via web by Mel Rawlinson
|
BLD15-00523
| BLD-Final | 5/11/2015 | 5/12/2015 | 5/11/2015 4:01:20 PM | A | PASS |
|
|
|
BLD13-03588
| BLD-Framing/Rough-in | 5/11/2015 | 5/12/2015 | 5/11/2015 2:32:50 PM | P | CANC |
|
|
rough frame inspection Phone #: ###-#### >> Inspection requested via web by Mel Rawlinson Inspection cancelled from web by: Mel Rawlinson
|