ESC15-00556
| Site Preparation | 5/11/2015 | 5/12/2015 | 5/12/2015 4:27:23 PM | P | PASS |
|
|
Pre-con conducted Monday (5/11); check for silt fence perimeter control installation and initial phase of work
Fiber wattles installed around perimeter of new phase on the west side of phase 1. Phase 1 BMPs (inlet protection) is installed. Approved for site grading and grubbing.
|
ESC14-00284
| General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 3:24:03 PM | | PASS |
|
|
Site landscaping has now started by homeowner. Home was occupied but no landscaping installed until this time. No violations occuring. Will re-inspect once stablization and landscaping are complete to final out ESC permit
|
ESC14-00135
| General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 2:45:15 PM | | PASS |
|
|
Still finishing interior. Culdesac is clean and no hillside erosion or discharges. No corrections.
|
ESC14-00921
| Aging Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 1:49:57 PM | | PASS |
|
|
No activity. Permit not yet expired.
|
ESC14-00955
| DOC - Permit Finaled | 5/12/2015 | 5/12/2015 | 5/12/2015 1:45:59 PM | P | PASS |
|
|
Area behind home has vegetated naturally after grading/leveling out disturbed area. Construction complete. Yard is not yet landscaped, to be complete by homeowner - no sediment leaving site. No further ESC inspections required, all other permits finaled.
|
ESC13-00684
| General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 1:38:42 PM | | PART |
|
|
Antelope Springs needs sweeping and inlet maintenance to remove loose sediment.
Bank of Penitiary Canal is in good condition with no rill or gully erosion on banks. SFH homes in progress. Will make request to homebuilders as well. RP - developer is on site monitoring ESC issues regularly.
|
ESC15-00360
| General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 1:19:09 PM | P | PASS |
|
|
Permit posted. Construction entrance installed, and straw wattle placed below recently installed retaining wall. No violations occuring at site. Hillside vegetation and rock outcrops on site are to be left for "natural" landscaping.
|
ESC15-00368
| General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 1:15:37 PM | P | PASS |
|
|
WIP on foundation. Backfill is kept with limits of disturbance and vegetation down slope has been carefully preserved to act as natural sediment control. Permit is posted. Culdesac is free of trackout. Approved.
|
ESC15-00035
| General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 1:04:05 PM | P | PASS |
|
|
Concrete washout container is now being utilized at site, and is located in staging area south of the roundabout. The roadabout is being asphalted today and curbing is installed. The southern boundary of the project at the east end has silt fence trenched in to keep any sediment out of natural drainage area within pasture.
No signifiicant fugitive dust occuring at time of inspection and no complaints received. No corrections necessary at this time.
|
ESC13-00755
| General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 12:47:29 PM | | PART |
|
|
Terraces perimeter BMPs (south border silt fence and DI bags) are installed keeping sediment on site and out of storm drains. The condos have now been landscaped. Need to determine what will occur when silt fence is removed.
The main access drive is now paved from Council Springs to Lysted. A temporary construction entrance was installed on Warm Springs for work on the north side of site. Landscaping is occuring in different phases.
Overall site is in good condition with no discharges, no fugitvie dust or other erosion issues, but some corrections are needed:
1. Improve construction entrance on Warm Springs with larger rock and longer distance as possible. 2. Sweep up trackout on Warm Springs 3. Clean up/shovel mud accumulations in gutter on access road at the Council Springs entrance.
|
ESC13-00552
| General Inspection | 5/11/2015 | 5/12/2015 | 5/12/2015 12:00:57 PM | A | PASS |
|
|
All lots either occupied with completed homes or active projects. DI bags and washout to be maintained by SFH builders (Eaglewood, Hayden, Riverwood, Mansion & Makeovers, Wood Bros)
Open areas stabilized. No further ESC inspections required on this permit. Sunnyridge #3 , see ESC14-00206, is open and actively inspected. Currently in compliance.
|
ESC13-00552
| DOC - Permit Finaled | 5/12/2015 | 5/12/2015 | 5/12/2015 11:56:00 AM | P | PASS |
|
|
|
ESC14-00206
| Random Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 11:52:12 AM | P | PASS |
|
|
Streets, gutters and sidewalks are installed. DI sediment bags have been installed on all new storm drains.
Permit and NOI information is posted. Approved. Parcels have been graded and preped for SFH. Currently no dust or issued, but may need tacifier on lots that will not be built this season.
|
ESC15-00233
| Site Preparation | 5/12/2015 | 5/12/2015 | 5/12/2015 11:25:47 AM | P | PASS |
|
|
Clint Phone #: ###-####
|
ESC13-00924
| General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 11:15:34 AM | P | PASS |
|
|
Note - please disregard previous inspection entry under the permit activity. Intended for ESC14-00200.
Final phase of Pine Tree Village is in progress. Inlets protected, trash contained. Scheduled to be done by end of summer and all ESC permits for Pine Tree Vilage will be closed once all areas landscaped/stabilized and DI bags removed.
|
ESC15-00501
| Site Preparation | 5/11/2015 | 5/12/2015 | 5/12/2015 11:14:41 AM | A | PART |
|
|
Cam Phone #: ###-####
BMPs on site. Straw wattle along Wright is not staked in, gator guard in some areas is staked and backfilled properly. Streets and sidewalks in Trailwind are clean and permit sign is posted. Trash on active projects is contained.
Correction needed before continuing with foundation: 1. New lined concrete washout is needed. 2. Stake in perimeter BMPs 3. Weekly housekeeping by ESC crew should be conducted.
|
ESC14-00932
| General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 10:08:19 AM | | PASS |
|
|
|
ESC14-00200
| General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 9:28:33 AM | | PEND |
|
|
Grass is not establishing in many of the data center grounds that have been hydroseeded. Layer of tacifier still keeping soil stabilized. No fugitve dust issues observed or reported.
Talked to resident adacent to Idaho Power access road and Involta easement. Claims area where new fiber optic was installed causes lots of dust issues. Also Idaho Power needs to oil/stabilize the road. Will contact Idaho environmental compliance/maintenance division to see what schedule for road maintenance is. May need to have Involta hydroseed area.
|
ESC14-00438
| General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 9:00:49 AM | | PASS |
|
|
|
ESC14-00266
| General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 8:41:28 AM | | PASS |
|
|
Final landscapinng and stabilization in progress. Project near completion. Will need to remove any temporary BMPs behind home that are unused. No violations occuring.
|