BLD14-03259
| FIRE-Final Inspection | 5/11/2016 | 5/12/2016 | 5/12/2016 12:42:44 PM | A | FAIL |
|
|
I performed a quick inspection with contractor but he did not have the city approved plans on site. I rescheduled for tomorrow morning to give him time
|
FIR16-00193
| INSP-Final Inspection | 5/12/2016 | 5/12/2016 | 5/12/2016 12:35:39 PM | P | PASS |
|
|
Permit finaled. Letter from HVAC contractor attached to file
|
FIR16-00253
| INSP-Sprinkler Rough-in | 5/11/2016 | 5/12/2016 | 5/12/2016 12:04:15 PM | A | PART |
|
|
General rough-in for the area inspected was ok except that there is deck mounted insulation that is hanging down and ubstructing the upright sprinkler heads and old partition walls that are also blocking upright sprinkler coverage. No piping is to be covered until these items are corrected and a re-inspection has taken place.
|
BLD16-00684
| FIRE-Final Inspection | 5/11/2016 | 5/12/2016 | 5/12/2016 10:55:48 AM | A | PASS |
|
|
Life safety passed. Racks have been cut down to less than 8'
|
FIR16-00315
| INSP-Final Inspection | 5/11/2016 | 5/12/2016 | 5/12/2016 10:26:23 AM | A | PASS |
|
|
Permit finaled
|