InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-03259 FIRE-Final Inspection5/11/20165/12/20165/12/2016 12:42:44 PMAFAIL
I performed a quick inspection with contractor but he did not have the city approved plans on site. I rescheduled for tomorrow morning to give him time
FIR16-00193 INSP-Final Inspection5/12/20165/12/20165/12/2016 12:35:39 PMPPASS
Permit finaled. Letter from HVAC contractor attached to file
FIR16-00253 INSP-Sprinkler Rough-in5/11/20165/12/20165/12/2016 12:04:15 PMAPART
General rough-in for the area inspected was ok except that there is deck mounted insulation that is hanging down and ubstructing the upright sprinkler heads and old partition walls that are also blocking upright sprinkler coverage. No piping is to be covered until these items are corrected and a re-inspection has taken place.
BLD16-00684 FIRE-Final Inspection5/11/20165/12/20165/12/2016 10:55:48 AMAPASS
Life safety passed. Racks have been cut down to less than 8'
FIR16-00315 INSP-Final Inspection5/11/20165/12/20165/12/2016 10:26:23 AMAPASS
Permit finaled