Inspections for the day of: Friday, May 12, 2017.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-04165 Electrical Rough-In5/12/20175/12/20175/12/2017 1:50:25 PMPPASS
Trench inspection Phone #: ###-#### Inspection requested via web by Craig Korell Ok cover trench from service to front of driveway for future electric gate. Depth is 20-24"
ELE17-01341 Permanent Service5/4/20175/12/20175/12/2017 1:46:12 PMPPASS
Farin ###-#### p/s u/g rec ok
ELE13-02725 Final5/12/20175/12/20175/12/2017 1:20:53 PMPCANC
Cory Phone #: ###-#### Should have been a RI, I added RI inspection.
ELE13-02725 Electrical Rough-In5/12/20175/12/20175/12/2017 1:20:18 PMPPASS
Ok cover basement
ELE17-00997 Final5/12/20175/12/20175/12/2017 1:03:06 PMPPASS
Larry Phone #: ###-#### Ok final
ELE15-00200 Final5/12/20175/12/20175/12/2017 12:50:50 PMPPASS
Please call Adam at ###-#### for Access. Thank you! Phone #: ###-#### Inspection requested via web by Adam Staigle Ok final
ELE17-01409 Electrical Rough-In5/12/20175/12/20175/12/2017 12:12:03 PMPPASS
Please call for access 30 minutes prior to inspection. Contractor, Brian ###-#### Or call electrician John ###-####
This for wall cover in kitchen Phone #: ###-#### Inspection requested via web by John Edwards Ok cover kitchen
ELE17-01441 Final5/12/20175/12/20175/12/2017 12:12:02 PMPNR
finish installing an outlet in cabinet peninsula. Phone #: ###-#### Inspection requested via web by John Edwards Is going to schedule for Monday
ELE17-01440 Electrical Rough-In5/12/20175/12/20175/12/2017 11:47:06 AMPPASS
Call Brad for access 30 minutes ahead Phone #: ###-#### Inspection requested via web by Brad Girard Ok cover. Tall entry framed to add a second floor area
ELE17-00952 Final5/11/20175/12/20175/12/2017 9:55:05 AMAPASS
Install sign reading "Vape". All primary power by others Phone #: ###-#### Inspection requested via web by Ken Olsen Ok final. UL listed with disconnect present
ELE17-00949 Electrical Rough-In5/11/20175/12/20175/12/2017 9:44:07 AMAPASS
Ceiling cover. Von is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Ok cover ceiling for all offices suite 140
ELE17-00546 Electrical Rough-In5/10/20175/12/20175/12/2017 9:27:58 AMANR
Phone #: ###-#### Inspection requested via web by Tom Jenkins
ELE17-01374 Conference5/11/20175/12/20175/12/2017 9:08:33 AMADONE
I am upgrading a panel and have questions about the meter.
Thank you Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Discussed new panel install. Overhead power to existing mast is not fusedby IDP. If IDP has to disconnect at the mast, contractor would have to upgrade everything (pipe size, weatherhead, meter etc). Contractor is removing fused panel in exchange for a new panel.
ELE16-04049 Final5/11/20175/12/20175/12/2017 8:43:25 AMANR
Someone should be there, please call Cory ###-#### if you have any questions. We did not complete this project. If you need to speak with Sublime, please call Clay at ###-####. Thank You!! Phone #: ###-#### Inspection requested via web by Clay Morgan New electrical contractor is finishing job. A permit from new contractor needs to be pulled before this permit can be finaled out.
ELE16-04049 Electrical Rough-In5/11/20175/12/20175/12/2017 8:42:28 AMAPASS
Someone should be there, please call Cory ###-#### if you have any questions. We did not complete this project. If you need to speak with Sublime, please call Clay at ###-####. Thank You!! Phone #: ###-#### Inspection requested via web by Clay Morgan Ok cover. All wires were fished in.