MIS02-00116
| BLD-Final | 5/6/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | A | DONE |
|
|
GARRETT OR ALISSA OTT ###-#### I have explained to the homeowner that the PM is a 4 hour window.
**Please make a note for the inspector to leave the inspection with the homeowner or drop off at 1025 S Capitol Blvd.
|
BLD02-00729
| BLD-Framing/Rough-in | 5/10/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | A | PASS |
|
|
for portable classroom--tie downs before skirting- tom -###-####
|
BLD02-00790
| BLD-Framing/Rough-in | 5/10/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | A | PART |
|
|
jack ###-#### instal gable vent and sealent package. ok to insulate. 5/13/2002 2:16:02 PM
|
BLD01-00654
| BLD-Final | 5/11/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/11/2002 at 10:55:53. Contact: ###-####. final ok 5/13/2002 9:55:03 AM
|
BLD02-00471
| BLD-Framing/Rough-in | 5/13/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | P | PART |
|
|
###-#### exterior ok for cover. 5/13/2002 2:28:48 PM
|
BLD02-00120
| BLD-Foundation | 5/13/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/13/2002 at 09:09:41. Contact: . blk and tie down ok for cover. 5/13/2002 3:04:04 PM
|
BLD02-01082
| BLD-Conference | 5/13/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | P | PASS |
|
|
justin ###-#### for conf--call 1st before insp placed with out insp appears to be adiquit in size and depth. 5/13/2002 3:13:58 PM
|
BLD02-01082
| BLD-Final | 5/13/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | P | PASS |
|
|
|