Inspections for the day of: Monday, May 13, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00376 BLD-Energy code compliance5/10/20025/13/20025/13/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 05/10/2002 at 13:42:33. Contact: ###-####.
BLD02-00376 BLD-Framing/Rough-in5/10/20025/13/20025/13/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 05/10/2002 at 13:43:11. Contact: ###-####.
BLD01-01691 BLD-Final5/10/20025/13/20025/13/2002 12:00:00 AMANR
fn occ- ###-####- rente . Needs hill side approval prior to calling for a bld final, called this number. 5/13/2002 12:00:35 PM
BLD02-00218 BLD-Energy code compliance5/10/20025/13/20025/13/2002 12:00:00 AMAPASS
No c/n on site went over items with builder that had been addressed at prior inspection. 5/13/2002 12:49:19 PM
BLD01-00308 BLD-Final5/13/20025/13/20025/13/2002 12:00:00 AMAFAIL
Scheduled by Inspector: 407 On 5/13/2002 11:24:18 AM Posted c/n. 5/13/2002 3:05:33 PM
BLD01-00308 BLD-Final5/13/20025/13/20025/13/2002 12:00:00 AMPFAIL
Scheduled by Inspector: 407 On 5/13/2002 2:46:06 PM. Went back to check addnl item and left c/n next to exting c/n. Told person working to let Darwin know when he returns. As I do not have his number. 5/13/2002 3:08:05 PM
BLD02-00484 BLD-Foundation5/11/20025/13/20025/13/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 05/11/2002 at 07:57:59. Contact: ###-####.Went back to a mono pour, but not yet complete , talked with contractor will recall. 5/13/2002 2:26:45 PM
BLD02-00297 BLD-Final5/12/20025/13/20025/13/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 05/12/2002 at 20:02:46. Contact: ###-####. PLEASE CALL 1ST
BLD02-01151 BLD-Conference5/13/20025/13/20025/13/2002 12:00:00 AMPNR
###-#### NOEL Owner just wanted to tell us that he will be doing work a section at a time and may take longer that permit I told him we were flexible on the permit expireation date as long as work was being done. 5/13/2002 3:42:16 PM
BLD01-02992 BLD-Final5/13/20025/13/20025/13/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 05/13/2002 at 09:40:09. Contact: ###-####. c/n posted. 5/13/2002 1:49:01 PM
BLD01-00617 BLD-Final5/13/20025/13/20025/13/2002 12:00:00 AMPCANC
###-####