MIS02-00120
| BLD-Final | 5/13/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | | CANC |
|
|
TONY-- THIS COMPLAINT IS ABOUT A MAJOR REMODEL WITH NO PERMITS.. PLUMING ,ELECTRICAL NO PERMITS ON FILE...DARLA
|
BLD02-00231
| BLD-Conference | 5/10/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | A | PART |
|
|
c/n still posted, met w/ G.S. on misc. items 5/13/2002 11:41:06 AM
|
BLD01-02588
| BLD-Final | 5/10/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 16:27:39. Contact: ###-####.
|
BLD01-02316
| BLD-Conference | 5/10/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | A | PART |
|
|
guy -###-#### for conf
ok for 25" in front of tub 5/13/2002 1:07:50 PM
|
BLD02-00337
| BLD-Framing/Rough-in | 5/10/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | A | PASS |
|
|
BRIAN ###-#### DRY WALL
5/13/2002 11:49:58 AM
|
BLD01-02875
| BLD-Framing/Rough-in | 5/10/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | A | PART |
|
|
bakery production room -gil ###-####
maintain fire blocks at ceiling line where comb. materials exist, ok to cover soffit area 5/13/2002 10:54:15 AM
|
MEC01-03379
| Final | 5/13/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | A | PASS |
|
|
|
MEC01-03677
| Final | 5/13/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | A | PASS |
|
|
|
BLD02-00585
| BLD-Other | 5/13/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/13/2002 at 09:23:16. Contact: ###-####.main floor fire wall, duplex built 5/14/2002 9:29:44 AM
|
MIS02-00120
| BLD-Conference | 5/13/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | P | PART |
|
|
STOP WORK ORDER POSTED 5/13/2002 2:09:05 PM
|
BLD02-00231
| BLD-Energy code compliance | 5/10/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | P | NR |
|
|
insu ###-#### justin
|
MEC02-01190
| Rough-in | 5/13/2002 | 5/13/2002 | 5/13/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/13/2002 at 08:48:14. Contact: ###-####.
r.i. ok need p test 5/13/2002 1:10:37 PM
|