PLM03-01362
| Sprinkler (Final) | 5/12/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | A | PASS |
|
|
###-#### tim final ok 5/13/2003 8:57:14 AM
|
PLM03-00420
| Final | 5/12/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | A | FAIL |
|
|
###-#### keri need bldg final prior to occ, pipe ice bin drain seprately from other wastes, 5/13/2003 3:42:34 PM
|
PLM02-00906
| Final | 5/13/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | FAIL |
|
|
DONNY ###-####-- BASEMENT 1ST & 3RD FLOORS set all fixtures, expose f.s. in car rental areas, install hbvb on all hose threads, rp required on cooling tower make up, expose vault access at cooling tower, expose manhole downstream of grease interceptor to verify flow, no temp till numbers 1,3,4,6 are complete. 5/13/2003 3:45:20 PM
|
PLM02-03874
| Final | 5/13/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | CANC |
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore rp not tested yet 5/13/2003 1:49:29 PM
|
PLM03-01367
| Water and/or Sewer | 5/13/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | PASS |
|
|
###-#### von sw final ok 5/13/2003 1:48:50 PM
|
PLM03-01298
| Water and/or Sewer | 5/13/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | PART |
|
|
stopped by twice today looks ok water service from bldg plus about 200'
|