MEC03-01170
| Pressure Test | 5/12/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/12/2003 at 2:14:42 PM. Contact: ###-####.
|
MEC03-01203
| Pressure Test | 5/12/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | A | FAIL |
|
|
pressure test failed, pressure down 5/13/2003 9:37:31 PM
|
MEC03-01075
| Final | 5/12/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | A | PASS |
|
|
Please inspect after 10:00a.m. Pressure test only. Thank you, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC03-00686
| Rough-in | 5/12/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | A | PASS |
|
|
PHIL; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
MEC03-01201
| Rough-in | 5/12/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | A | NR |
|
|
###-#### paul gas piping to a dryer
|
MEC02-03841
| Final | 5/13/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Matt Hansen
|
MEC03-00930
| Final | 5/13/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | NR |
|
|
ok for tile, need to finish b-vent to water heater 5/13/2003 10:04:17 PM
|
MEC03-01205
| Final | 5/13/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | PASS |
|
|
preston; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
MEC03-01170
| Rough-in | 5/12/2003 | 5/13/2003 | 5/12/2003 2:51:36 PM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 5/12/2003 at 2:14:24 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 12 2003 2:51PM.
|