Inspections for the day of: Thursday, May 13, 2004.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM04-01178 Plumbing Rough-in5/12/20045/13/20045/13/2004 12:00:00 AMAPASS
paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
PLM04-01216 Plumbing Rough-in5/12/20045/13/20045/13/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 5/12/2004 at 11:54:44 PM. Contact: ###-####.
PLM04-00501 Plumbing Rough-in5/13/20045/13/20045/13/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 5/13/2004 at 6:37:51 AM. Contact: ###-####. test failed on DWV system water system test ok need to move pex water piping away from all can lighting 12 inches need to support all vent,s in over head every 4 feet 5/13/2004 10:37:50 AM
PLM04-00616 Final5/13/20045/13/20045/13/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 5/13/2004 at 8:29:30 AM. Contact: ###-####.
PLM04-00747 Plumbing Rough-in5/13/20045/13/20045/13/2004 12:00:00 AMPPASS
Kevin; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes last set of roof and over flow drain,s test ok 5/13/2004 2:00:47 PM
PLM04-01238 Sprinkler (Final)5/13/20045/13/20045/13/2004 12:00:00 AMPPASS
8###-#### Luiz
PLM04-01238 Sprinkler (Final)5/13/20045/13/20045/13/2004 12:00:00 AMPPASS
8###-#### Luiz
PLM04-01239 Sprinkler (Final)5/13/20045/13/20045/13/2004 12:00:00 AMPPASS
8###-#### Luiz
PLM04-01227 Final5/12/20045/13/20045/13/2004 12:00:00 AMPPASS
paul ###-#### or carol ###-####