BLD08-02589
| FIRE-Final Inspection | 5/13/2009 | 5/13/2009 | 5/13/2009 5:14:30 PM | P | NH |
|
|
Rescheduled 5/14.
|
FIR09-00182
| INSP-Final Inspection | 5/12/2009 | 5/13/2009 | 5/13/2009 5:13:12 PM | A | FAIL |
|
|
Duct detector at the conference room failed to shut down power to the HVAC unit, DD at the mechanical room programed incorrectly, horns and strobes are not in sync. on the 1st or 2nd floors, fire hat at the elevator is not repaired, reinspection fees will apply.
|
FIR08-00775
| FIR-Aging Inspection | 5/13/2009 | 5/13/2009 | 5/13/2009 4:46:48 PM | | DONE |
|
|
Work in progress, construction underway.
|
BLD05-01680
| FIRE-Final Inspection | 5/13/2009 | 5/13/2009 | 5/13/2009 4:45:51 PM | P | NR |
|
|
Notified contractor of project related fire alarm and sprinkler permits in need of inspection prior to BLD fire life safety approvals.
|
BLD09-00292
| FIRE-Final Inspection | 5/13/2009 | 5/13/2009 | 5/13/2009 4:44:25 PM | P | PASS |
|
|
Contractor to remove one exit sign and repair one exit sign above the second exit door prior to structural final.
|
BLD09-00390
| FIRE-Final Inspection | 5/13/2009 | 5/13/2009 | 5/13/2009 4:42:39 PM | P | NR |
|
|
Project is not ready for final inspection at this time per contractor, discussed related issues for life safety requirements.
|
BLD08-01555
| FIRE-Conference | 5/13/2009 | 5/13/2009 | 5/13/2009 4:39:50 PM | P | DONE |
|
|
Regarding on site meeting for project schedule.
|
BLD08-01640
| FIRE-Conference | 5/13/2009 | 5/13/2009 | 5/13/2009 4:38:45 PM | A | DONE |
|
|
On site conference regarding project schedule.
|
BLD08-02383
| FIRE-Final Inspection | 5/12/2009 | 5/13/2009 | 5/13/2009 4:37:32 PM | A | FAIL |
|
|
Project related fire alarm permit work is not approved for final at this time.
|