Inspections for the day of: Wednesday, May 13, 2009.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01432 General Inspection5/13/20095/13/20095/13/2009 2:29:53 PMPPART
Signs not posted so I gave the RP (Bob T.) two additional ones. Discussed plans for stabilizing the site. Site had been watered to reduce wind erosion. Minor trash and debris not containerized.
ESC08-00811 Random Inspection5/13/20095/13/20095/13/2009 1:40:10 PMPFAIL
Verbal correction to company: Contacted RP-Mark and he informed me that he is no longer with Vertical Con. Call and left voice mail to Vertical, needs valid certified RP, as well, need to have washout area for stucco and other non-stormwater residuals. Observed recent washout activities had occured without proper containment. Inspector 460 will follow up on 5/15/09.