Inspections for the day of: Wednesday, May 13, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00098 INSP-Alarm Testing5/13/20095/13/20095/14/2009 3:33:14 PMPPASS
The fire alarm rough-in for the first and second floors of building C passed.
FIR09-00244 INSP-Sprinkler Rough-in5/12/20095/13/20095/14/2009 8:14:33 AMAPASS
permit finaled
BLD09-00105 FIRE-Final Inspection5/12/20095/13/20095/13/2009 2:53:35 PMAFAIL
There were no approved plans on site. I did a quick walk through and pointed out door hardware issues, a fire extinguisher that needs to be mounted and the address needs to be installed. A occupant load sign may be required as well.
FIR08-00844 INSP-Final Inspection5/13/20095/13/20095/13/2009 1:57:57 PMPPASS
Permit finaled
FIR07-01031 INSP-Sprinkler Rough-in5/13/20095/13/20095/13/2009 1:48:16 PMPPASS
See the city approved plans for locations with todays date where the sprinkler piping can be covered.
FIR07-01032 INSP-Sprinkler Rough-in5/13/20095/13/20095/13/2009 1:47:56 PMPPASS
See the city approved plans for locations with todays date where the sprinkler piping can be covered.
FIR08-00786 INSP-Alarm Testing5/12/20095/13/20095/13/2009 12:49:55 PMAFAIL
The original city approved plans were not provided. All of the signals sent to the monitoring company were undefined even though I had been told that the monitoring had been set up. The phone line #2 did not report a trouble signal when disconnected. Labels need to be provided at the NAC panels and the fire sprinkler risers. See the onsite plans for devices tested on the first floor administrative area. These will need to be retested due to the signals not being sent. Also see this set of plans for room descriptions that smoke detectors had that did not match those on the plans. The NAC panels interconnection with the facp was verified for supervision. Both phone lines have separate phone numbers as well.
FIR07-01051 INSP-Final Inspection5/12/20095/13/20095/13/2009 12:45:12 PMAFAIL
Todays inspection covered the fire sprinkler device interconnections with the facp which passed. Also the forward flush passed. The sprinkler contractor is going to coordinate with the fire alarm contractor the riser descriptions so they match the what is listed on the facp. Ceiling tile was missing and the zone map has not been provided yet.