FIR13-00073
| INSP-Final Inspection | 5/13/2013 | 5/13/2013 | 5/13/2013 5:27:21 PM | P | PART |
|
|
Final pending verification of ceiling repair work.
|
BLD13-00868
| FIRE-Final Inspection | 5/13/2013 | 5/13/2013 | 5/13/2013 5:26:08 PM | P | PART |
|
|
2nd floor NW corner and center south new offices passed fire life safety inspection.
|
BLD12-03273
| FIRE-Sprinkler Rough-in | 5/13/2013 | 5/13/2013 | 5/13/2013 5:24:22 PM | A | PART |
|
|
Fire sprinkler work at the first floor lobby sheetrock soffits and grid ceiling areas okayed for cover.
|
FIR13-00172
| INSP-Final Inspection | 5/9/2013 | 5/13/2013 | 5/13/2013 5:19:11 PM | A | DEFR |
|
|
Tim Phone #: ###-#### *Rescheduled for 5/17 per contractor*
|
BLD13-00356
| FIRE-Final Inspection | 5/10/2013 | 5/13/2013 | 5/13/2013 12:54:30 PM | A | NR |
|
|
Jay-Please call prior to inspection Phone #: ###-####
|
FIR12-00081
| FIR-Aging Inspection | 5/13/2013 | 5/13/2013 | 5/13/2013 12:53:57 PM | | PEND |
|
|
|
BLD13-01053
| FIRE-Conference | 5/13/2013 | 5/13/2013 | 5/13/2013 12:53:03 PM | A | DONE |
|
|
Regarding C/N items, landing requirements, etc.
|
BLD13-00449
| FIRE-Final Inspection | 5/10/2013 | 5/13/2013 | 5/13/2013 12:38:55 PM | A | PASS |
|
|
Life safety inspection approved pending the fire extinguisher is provided with a current certification tag- to be verified prior to final.
|