FIR13-00200
| INSP-Sprinkler Rough-in | 5/10/2013 | 5/13/2013 | 5/13/2013 3:48:01 PM | P | PASS |
|
|
Sprinkler rough-in passed. In two areas insulation needs to be secured to the roof deck that is obstructing the upright sprinkler coverage. This work will need to be done prior to a final sign off.
|
BLD12-00677
| FIRE-Final Inspection | 5/10/2013 | 5/13/2013 | 5/13/2013 2:07:22 PM | A | PASS |
|
|
Life safety passed
|
BLD12-01772
| FIRE-Final Inspection | 5/10/2013 | 5/13/2013 | 5/13/2013 11:36:31 AM | A | PART |
|
|
Life safety for the east half of the building is passed. The work for the west half is not yet complete.
|
BLD13-00423
| FIRE-Final Inspection | 5/10/2013 | 5/13/2013 | 5/13/2013 10:55:56 AM | A | PASS |
|
|
Life safety passed
|
FIR13-00206
| INSP-Final Inspection | 5/9/2013 | 5/13/2013 | 5/13/2013 10:54:34 AM | A | PASS |
|
|
Permit finaled. Hood suppresson system functioned correctly.
|
BLD12-02195
| FIRE-Final Inspection | 5/10/2013 | 5/13/2013 | 5/13/2013 9:34:56 AM | A | PASS |
|
|
life safety passed
|