Inspections for the day of: Wednesday, May 13, 2015.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00094 General Inspection5/13/20155/13/20155/13/2015 4:23:33 PMPPART
Upper entrance is still closed off to prevent trackout in multiple areas. Joint-trenching for utilities is occuring next to entrance on Windsong.

Site retained sediment and contours and berms disperse runoff in several areas, preventing offsite discharges.

1 correction:
Sweep up existing trackout at end of week. Correction discussed with RP.
ESC14-01044 General Inspection5/13/20155/13/20155/13/2015 3:50:19 PM PASS
Hillside home near completion. Construction and earthwork stayed well within limits of disturbance on parcel. Back slope native vegetation was kept in place. Draco culdesace is free of trackout and loose sediment. Approved.
ESC14-01081 Aging Inspection5/13/20155/13/20155/13/2015 2:15:02 PM PASS
Home complete. ESC permit conditions satisfied. Permit finaled.
ESC14-01081 DOC - Permit Finaled5/13/20155/13/20155/13/2015 2:14:37 PMPPASS
ESC13-01159 General Inspection5/13/20155/13/20155/13/2015 1:14:26 PM PASS
Peppermill Streets and gutters are clean and free of trackout or deposited sediment. Stormwater swale appears to be infiltrating properly now as well. CBH is building SFHs and using the lined designated washout.

Site is currently in compliance with ESC permit conditions.
ESC14-00940 Aging Inspection5/13/20155/13/20155/13/2015 12:56:59 PM PASS
No construction activity at site. Backyard area is still disturbed - unclear if existing garage is the new addition. Will keep open for now. No issues at site.
ESC15-00186 General Inspection5/13/20155/13/20155/13/2015 12:47:45 PMPCANC
duplicate entry
ESC15-00188 General Inspection5/13/20155/13/20155/13/2015 12:46:46 PMPPASS
WIP on frame. No trackout or sediment runoff occuring. 4 units being built at once in senior community. 3 of 4 have walls erected. BMPs installed, permit posted. No complaints received. Clean site - trash and building materials are well contained.
ESC15-00187 General Inspection5/13/20155/13/20155/13/2015 12:46:27 PMPPASS
WIP on frame. No trackout or sediment runoff occuring. 4 units being built at once in senior community. 3 of 4 have walls erected. BMPs installed, permit posted. No complaints received. Clean site - trash and building materials are well contained.
ESC15-00186 General Inspection5/13/20155/13/20155/13/2015 12:44:29 PMPPASS
WIP on frame. No trackout or sediment runoff occuring. 4 units being built at once in senior community. 3 of 4 have walls erected. BMPs installed, permit posted. No complaints received. Clean site - trash and building materials are well contained.
ESC15-00185 Random Inspection5/13/20155/13/20155/13/2015 12:44:19 PMPPASS
WIP on frame. No trackout or sediment runoff occuring. 4 units being built at once in senior community. 3 of 4 have walls erected. BMPs installed, permit posted. No complaints received. Clean site - trash and building materials are well contained.
ESC14-01023 General Inspection5/13/20155/13/20155/13/2015 11:38:36 AMPPASS
WIP. Silt fence along front was reinstalled. No discharges or sediment trackout from site after significant rainfall. No corrections at this time.
ESC14-00614 Random Inspection5/13/20155/13/20155/13/2015 11:37:39 AMPPASS
Home complete. Adjacent lot cleaned. Grass under ECB is growing well. Temp. silt fence is still installed. Will keep in for further stabilization . Should be good for removal in late June or July.
ESC14-00759 General Inspection5/13/20155/13/20155/13/2015 11:36:36 AM PASS
WIP. Hillside silt fence has remained intact throughout whole project and vegetative buffer on slope maintained. Unfinished driveway is blocked off to prevent trackout by contractors. No violations observed.
ESC15-00177 General Inspection5/13/20155/13/20155/13/2015 11:31:55 AMPPASS
Home site is excavatied for foundation work to begin. Silt fence is trenched in at bottom of lot. Trackout from excavator was cleaned. Permit posted. Approved.
ESC14-00356 General Inspection5/13/20155/13/20155/13/2015 11:23:07 AM PASS
Foundation slab and driveway are now complete. Wattle protecting onsite swale from sediment is in good condition. Very clean site, keeping well with limits of disturbance. Permit sign is posted. No corrections required.
ESC15-00594 Site Preparation5/12/20155/13/20155/13/2015 10:57:45 AMAPASS
David Phone #: ###-####

Permit sign posted. Homeowner RP is PE building double tier retaining wall. Straw wattle secured around front bank. Approved for construction. Will call for site final - expect to complete by June.
ESC15-00369 Site Preparation5/13/20155/13/20155/13/2015 10:05:52 AMPPASS

Permit signs posted. Drop inlets protected. First 4 homes to start in River Heights #6. Excavation to start today. Cement work next week. RP Erbie on site to discuss.

Designated lined washout will installed this week at culdesac on Playwright. Approved
ESC15-00405 Site Preparation5/12/20155/13/20155/13/2015 10:02:53 AMAPASS
Phone #: ###-#### Inspection requested via web by Erby Gonzales


Permit signs posted. Drop inlets protected. First 4 homes to start in River Heights #6. Excavation to start today. Cement work next week. RP Erbie on site to discuss.

Designated lined washout will installed this week at culdesac on Playwright. Approved
ESC15-00402 Site Preparation5/12/20155/13/20155/13/2015 10:02:20 AMAPASS
Phone #: ###-#### Inspection requested via web by Erby Gonzales

Permit signs posted. Drop inlets protected. First 4 homes to start in River Heights #6. Excavation to start today. Cement work next week. RP Erbie on site to discuss.

Designated lined washout will installed this week at culdesac on Playwright. Approved