BLD14-02837
| FIRE-Final Inspection | 5/12/2016 | 5/13/2016 | 5/13/2016 12:19:23 PM | A | FAIL |
|
|
Project is not ready for a final inspection nor is the first phase of work. Need fire alarm and fire sprinkler work called in for inspection. I noted that the smoke detector and ceiling mounted horn/strobe is overspaced. Lee Phone #: ###-####
|
FIR15-00724
| INSP-Sprinkler Rough-in | 5/12/2016 | 5/13/2016 | 5/13/2016 12:09:16 PM | A | PASS |
|
|
Piping above the ceilings for the north half of the building is ok to cover.
|
BLD16-01150
| FIRE-Final Inspection | 5/12/2016 | 5/13/2016 | 5/13/2016 9:49:19 AM | A | PASS |
|
|
Life safety passed. No product is currently being stored on racks and per tenant they will not be useing the to shelf.
|
BLD14-03259
| FIRE-Final Inspection | 5/12/2016 | 5/13/2016 | 5/13/2016 9:33:51 AM | A | PASS |
|
|
life safety passed
|
FIR16-00195
| INSP-Final Inspection | 5/6/2016 | 5/13/2016 | 5/13/2016 7:26:37 AM | A | PASS |
|
|
permit finaled
|