ESC15-00789
| General Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 4:43:08 PM | | PASS |
|
|
see also ESC15-01184. No sediment or runoff from site. BMPs installed.
|
ESC15-01164
| Aging Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 3:30:18 PM | | CANC |
|
|
project complete, no outstanding ESC issues. Permit closed.
|
ESC15-01164
| DOC - Permit Finaled | 5/13/2016 | 5/13/2016 | 5/13/2016 3:29:45 PM | P | PASS |
|
|
|
ESC15-01074
| DOC - Permit Finaled | 5/13/2016 | 5/13/2016 | 5/13/2016 3:01:12 PM | P | PASS |
|
|
|
ESC15-01172
| Aging Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 2:44:48 PM | | PASS |
|
|
WIP on frame. No violations. Approved.
|
ESC15-00586
| General Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 2:12:47 PM | | CANC |
|
|
|
ESC16-00225
| Complaint Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 2:01:47 PM | P | PEND |
|
|
Complaint regarding grading limits:
- Developer working in future area of stormwater retention pond for BH #7 - approximately 1 acre of disturbance, permitted for 8.5 acres with Boise. - water truck onsite for dust control as needed. No significant dust existing project area - No BMP failures observed. Construction entrance and sediment controls working well. Site inspection form are located in SWPPP box and up to date - Sediment control BMPs installed at bottom of new excavated area in question
Investigating if this 1 acre is part of the 8.5 for project.
Correction request:
- update site map in SWPPP folder and show BMPs installed.
|
ESC15-01263
| Aging Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 12:37:50 PM | | DONE |
|
|
No activity at site. No issues. No inspector activity logged on BLD permit, which is soon to expire.
|
ESC15-01288
| General Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 11:56:19 AM | P | PASS |
|
|
WIP on utility and road installation at RH #7. Permit sign and SWPPP information is posted, construction is installed and no trackout. No discharges on or offsite, no fugitive dust at time of inspection and no complaints received.
No corrections issued, approved.
|
ESC15-00556
| General Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 11:53:21 AM | | PASS |
|
|
No new subdivision activity at East Valley phase 2-3. No fugitive wind blown dust observed, no recent complaints received. No trackout or discharges. SFHs in active phases are in compliance.
|
ESC15-01350
| DOC - Permit Finaled | 5/13/2016 | 5/13/2016 | 5/13/2016 11:52:09 AM | P | PASS |
|
|
Townhome construction/earthwork complete. Exterior stabilized, landscaped, and sidewalks/alley cleaned. Temp BMP DI bags to remain installed and Blvd townhomes continue. Multiple SFHs in progress by Tahoe Homes.
|
ESC15-01348
| DOC - Permit Finaled | 5/13/2016 | 5/13/2016 | 5/13/2016 11:52:01 AM | P | PASS |
|
|
Townhome construction/earthwork complete. Exterior stabilized, landscaped, and sidewalks/alley cleaned. Temp BMP DI bags to remain installed and Blvd townhomes continue. Multiple SFHs in progress by Tahoe Homes.
|
ESC15-01344
| DOC - Permit Finaled | 5/13/2016 | 5/13/2016 | 5/13/2016 11:51:52 AM | P | PASS |
|
|
Townhome construction/earthwork complete. Exterior stabilized, landscaped, and sidewalks/alley cleaned. Temp BMP DI bags to remain installed and Blvd townhomes continue. Multiple SFHs in progress by Tahoe Homes.
|
ESC15-01342
| DOC - Permit Finaled | 5/13/2016 | 5/13/2016 | 5/13/2016 11:48:56 AM | P | PASS |
|
|
Townhome construction/earthwork complete. Exterior stabilized, landscaped, and sidewalks/alley cleaned. Temp BMP DI bags to remain installed and Blvd townhomes continue. Multiple SFHs in progress by Tahoe Homes.
|
ESC15-00873
| DOC - Permit Finaled | 5/13/2016 | 5/13/2016 | 5/13/2016 11:31:39 AM | P | PASS |
|
|
Construction complete. All permits finaled. No ESC corrections/actions needed.
|
ESC15-00872
| DOC - Permit Finaled | 5/13/2016 | 5/13/2016 | 5/13/2016 11:28:21 AM | P | PASS |
|
|
East Valley home now landscaped and stabiilzed. All permits finaled. ESC condtions satisfied. Tahoe Homes to remove sediment bags after all SFHs & phases complete3
|
ESC16-00092
| Site Preparation | 5/12/2016 | 5/13/2016 | 5/13/2016 11:14:11 AM | A | PASS |
|
|
Inspection requested via web by Kyle Buzzell
Park Place townthome/condos are in progress. These 4 site preps are last 4 to start on the original phase of the project. Trash is contained, no windblown debris in park or Walling Creek area . Concrete washout pan is located on north side of Barber Station Dr. MS4 inlets have sediment filter bags installed and emptied every 2 weeks. RP Kyle onsite supervising.
|
ESC16-00150
| Site Preparation | 5/12/2016 | 5/13/2016 | 5/13/2016 11:13:45 AM | A | PASS |
|
|
Inspection requested via web by Kyle Buzzell
Park Place townthome/condos are in progress. These 4 site preps are last 4 to start on the original phase of the project. Trash is contained, no windblown debris in park or Walling Creek area . Concrete washout pan is located on north side of Barber Station Dr. MS4 inlets have sediment filter bags installed and emptied every 2 weeks. RP Kyle onsite supervising.
|
ESC16-00152
| Site Preparation | 5/12/2016 | 5/13/2016 | 5/13/2016 11:13:20 AM | A | PASS |
|
|
Inspection requested via web by Kyle Buzzell
Park Place townthome/condos are in progress. These 4 site preps are last 4 to start on the original phase of the project. Trash is contained, no windblown debris in park or Walling Creek area . Concrete washout pan is located on north side of Barber Station Dr. MS4 inlets have sediment filter bags installed and emptied every 2 weeks. RP Kyle onsite supervising.
|
ESC16-00148
| Site Preparation | 5/12/2016 | 5/13/2016 | 5/13/2016 11:12:46 AM | A | PASS |
|
|
Inspection requested via web by Kyle Buzzell
Park Place townthome/condos are in progress. These 4 site preps are last 4 to start on the original phase of the project. Trash is contained, no windblown debris in park or Walling Creek area . Concrete washout pan is located on north side of Barber Station Dr. MS4 inlets have sediment filter bags installed and emptied every 2 weeks. RP Kyle onsite supervising.
|
ESC13-00193
| General Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 10:21:31 AM | | PASS |
|
|
WIP on SFHs on Painted Feather and and Mesa Verde. Trash and materials contained, DIs have sediment filters, and perimeter wattles are installed. No discharges or trackout from site. Somerset Village is near capacity. No corrections issues.
|
ESC11-00192
| General Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 10:01:40 AM | | PASS |
|
|
|
ESC15-01357
| DOC - Permit Finaled | 5/13/2016 | 5/13/2016 | 5/13/2016 9:34:05 AM | P | PASS |
|
|
|
ESC15-01357
| Aging Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 9:33:46 AM | | PASS |
|
|
Project complete. All permits finaled. ESC conditions satisfied.
|
ESC15-00560
| DOC - Permit Finaled | 5/13/2016 | 5/13/2016 | 5/13/2016 8:42:50 AM | P | PASS |
|
|
|
ESC15-00560
| General Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 8:42:28 AM | | PASS |
|
|
No activitiy at site or on BLD permit - permit expired. No disturbed area or sediment runoff at site. Permit finaled.
|
ESC15-00496
| General Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 8:42:09 AM | | PASS |
|
|
No activitiy at site or on BLD permit - permit expired. No disturbed area or sediment runoff at site. Permit finaled.
|
ESC15-00496
| DOC - Permit Finaled | 5/13/2016 | 5/13/2016 | 5/13/2016 8:27:49 AM | P | PASS |
|
|
|