BLD18-03500
| BLD-Final | 5/13/2019 | 5/13/2019 | 5/13/2019 4:57:15 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD18-03500
| DOC - Permit Finaled | 5/13/2019 | 5/13/2019 | 5/13/2019 4:57:07 PM | P | PASS |
|
|
|
BLD18-03500
| BLD-Blower Door Test Results | 5/13/2019 | 5/13/2019 | 5/13/2019 4:56:44 PM | P | DONE |
|
|
ACH50- 4.5
|
BLD18-04363
| BLD-Energy code compliance | 5/8/2019 | 5/13/2019 | 5/13/2019 4:56:26 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD18-02205
| BLD-Footing | 5/13/2019 | 5/13/2019 | 5/13/2019 4:56:15 PM | P | PASS |
|
|
Work in progress...
|
BLD18-04526
| BLD-Final | 5/10/2019 | 5/13/2019 | 5/13/2019 4:55:56 PM | P | NR |
|
|
Rick Phone #: ###-####
|
BLD18-04526
| BLD-Blower Door Test Results | 5/13/2019 | 5/13/2019 | 5/13/2019 12:54:32 PM | P | CANC |
|
|
|
BLD18-03500
| BLD-Other | 5/13/2019 | 5/13/2019 | 5/13/2019 12:53:57 PM | P | CANC |
|
|
Drainage test and landscaping final Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD18-01868
| BLD-Framing/Rough-in | 5/9/2019 | 5/13/2019 | 5/13/2019 12:50:29 PM | A | PASS |
|
|
Ok to insulae...
|
BLD19-00483
| BLD-Ceiling Grid Inspection | 5/12/2019 | 5/13/2019 | 5/13/2019 12:22:58 PM | A | PEND |
|
|
OK to cover, pending Mech rough-in...
|