Inspections for the day of: Wednesday, May 13, 2020.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE20-01277 Permanent Service5/13/20205/13/20205/13/2020 2:23:18 PMPPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton p/s u/g n ok
ELE20-00392 Final5/13/20205/13/20205/13/2020 2:22:59 PMPPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok final. 2 can trims completed. Signed card.
ELE18-01794 Permanent Service5/12/20205/13/20205/13/2020 12:52:36 PMPPASS
Inspector can just walk through the gate under carport. Home owner may or may not be home. Dog is friendly, but will be locked indoors. Phone #: ###-#### Inspection requested via web by Deb Morton 2 grd rods p/s o/h n ok
ELE20-01633 Electrical Rough-In5/12/20205/13/20205/13/2020 12:15:42 PMPPASS
This is for the underground. If you have any questions please feel free to contact Luke ###-####. Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover ground work for AC
ELE19-00947 Final5/12/20205/13/20205/13/2020 11:40:51 AMPPART
Phone #: ###-#### Inspection requested via web by Andy Chambers Ok partial final for gym and cafeteria
ELE20-00326 Rough-In Permanent Service5/12/20205/13/20205/13/2020 10:13:17 AMAPASS
I won''t be onsite Wednesday, please let me know if you have any questions or concerns. Thank you.
The exposed SER is supposed to get framed out.....but they still haven''t fixed the previous 4. Phone #: ###-#### Inspection requested via web by Dan Jennings Ok cover, AC wire moved. No service
ELE20-00327 Rough-In Permanent Service5/12/20205/13/20205/13/2020 10:12:42 AMAPASS
I won''t be onsite Wednesday, please let me know if you have any questions or concerns. Thank you! Phone #: ###-#### Inspection requested via web by Dan Jennings Ok cover, AC wire moved. No service
ELE20-00330 Rough-In Permanent Service5/12/20205/13/20205/13/2020 10:12:13 AMAPASS
The HVAC base unit was relocated from the east side of the first floor to the west side of the second floor. I re-routed the existing circuit to the new location.
Let me know if you have any questions. Thanks! Phone #: ###-#### Inspection requested via web by Dan Jennings Ok cover, AC wire moved. No service
ELE20-00331 Rough-In Permanent Service5/12/20205/13/20205/13/2020 10:11:44 AMAPASS
The HVAC base unit was relocated from the east side of the first floor to the west side of the second floor. I re-routed the existing circuit to the new location.
Let me know if you have any questions. Thanks! Phone #: ###-#### Inspection requested via web by Dan Jennings Ok cover, wire moved for AC location. no service
ELE20-00393 Rough-In Permanent Service5/12/20205/13/20205/13/2020 9:38:46 AMAPASS
street lighting service pedestal Phone #: ###-#### Inspection requested via web by Debby Pierce AFC needs posted upon final. p/s u/g n ok
ELE17-02875 ELE-Aging Inspection5/13/20205/13/20205/13/2020 5:29:00 AM FAIL
Will turn over to Daryl DeGrange, Chief Inspector
ELE17-03649 ELE-Aging Inspection5/13/20205/13/20205/13/2020 5:26:40 AM DONE
Doc-expired. City shut project down because sewer was needing to be re-routed, it was never done.
ELE17-03649 DOC - Permit Expired5/13/20205/13/20205/13/2020 5:25:21 AMADONE
I have had conversations with contractor about job. Work was never done at this address due to city shutting it down because of re-routing sewer.