PLM96-00164
| INSP - Final | 5/14/1996 | 5/14/1996 | 5/14/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - final o/k 5/14/6 347
|
PLM96-01267
| INSP - Plumbing Rough-in | 5/14/1996 | 5/14/1996 | 5/14/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 3 TUB 2 SINK 1 W/B 1 W/H 1 R/I O/K 5/14/6 347
|
PLM96-00930
| INSP - Sprinkler & Backflow | 5/13/1996 | 5/14/1996 | 5/14/1996 12:00:00 AM | A | FAIL |
|
|
05/13/96 347 - device must be tested
|
PLM96-01073
| INSP - Sprinkler & Backflow | 5/13/1996 | 5/14/1996 | 5/14/1996 12:00:00 AM | A | PASS |
|
|
05/13/96 347 - sp. o/k 5/14/6 347
|