Inspections for the day of: Friday, May 14, 1999.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC99-01579 INSP - Final5/13/19995/14/19995/14/1999 12:00:00 AMANR
05/14/99 340 - Janet ###-####; unable to locate job, called cont to reca
MEC99-01579 INSP - Final5/13/19995/14/19995/14/1999 12:00:00 AMANR
05/14/99 340 - Janet ###-####; unable to locate job, called cont to reca
BLD98-03642 INSP - Framing/Rough-in5/13/19995/14/19995/14/1999 12:00:00 AMAPART
05/14/99 340 - John ###-#### Tbar inspection; back room, add fasteners a
BLD98-03754 INSP - Framing/Rough-in5/13/19995/14/19995/14/1999 12:00:00 AMAFAIL
05/14/99 340 - lconference/ Monty ###-####; need elec,dbl studsat hd's.
BLD99-00022 INSP - Framing/Rough-in5/13/19995/14/19995/14/1999 12:00:00 AMAPART
05/14/99 340 - bing ###-####; 1st shaft ok, add fasteners, ok to install
BLD99-00603 INSP - Framing/Rough-in5/13/19995/14/19995/14/1999 12:00:00 AMAPART
05/14/99 340 - Greg ###-#### ok to rock ; has elec & htg c/n..need submi
BLD99-00930 INSP - Framing/Rough-in5/13/19995/14/19995/14/1999 12:00:00 AMAPART
05/14/99 340 - [8677613].
BLD99-00973 INSP - Framing/Rough-in5/12/19995/14/19995/14/1999 12:00:00 AMAPART
05/14/99 340 - trip test/ conference/ requested 9:00/Rod ###-####; fryer
BLD99-00140 INSP - Framing/Rough-in5/14/19995/14/19995/14/1999 12:00:00 AMPPART
05/14/99 340 - ###-#### JOAN//CEILING GRID ok to place tile at hall, etc
BLD99-00414 INSP - Final5/14/19995/14/19995/14/1999 12:00:00 AMPPASS
05/14/99 340 - Josh ###-####; ok, card to cont.
BLD98-00171 INSP - Framing/Rough-in5/14/19995/14/19995/14/1999 12:00:00 AMPPART
05/14/99 340 - Blake ###-#### ok to ins. ext wall, keep c/n
BLD98-02031 INSP - Framing/Rough-in5/14/19995/14/19995/14/1999 12:00:00 AMPPART
05/14/99 340 - ken ###-####; ok to use UBC 1016.5 EXC. for rest room doo