PLM01-01490
| Plumbing Rough-in | 5/11/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-01490
| Final | 5/14/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 5/14/2001 9:16:15 AM final ok
|
PLM00-04083
| Final | 5/14/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 09:42:11. Contact: ###-####. thermol expantion protection isolated from water heater, set all equipment, test all backflow preventors, provide med gas cert., turn 90s down and screen vacuum and compressed air terminations. 5/14/2001 3:03:44 PM
|