BLD00-02752
| BLD-Framing/Rough-in | 5/11/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | A | PART |
|
|
for comp room for pres test---10:00 ??????????/ed -###-####..grid ok, seal membrane penetrations at 1hr walls 5/14/2001 10:37:21 AM
|
BLD01-00924
| BLD-Framing/Rough-in | 5/14/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 07:01:16. Contact: ###-####....ok to continue, add backing studs and lead as needed (x-ray room) 5/14/2001 10:52:45 AM
|
BLD01-00896
| BLD-Conference | 5/14/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 5/14/2001 9:39:37 AM w/ masons...ok to add 2 #4 at openings in lieu of #5... complete lay up for insp.
|
BLD00-02394
| BLD-Conference | 5/14/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 5/14/2001 11:39:19 AM need eng's ok for struct modifications...failed concrete at int. shear walls, etc.
|
BLD01-00673
| BLD-Framing/Rough-in | 5/14/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 09:56:30. Contact: ###-####....ext nailing ok 5/14/2001 3:38:39 PM
|
BLD00-03659
| BLD-Framing/Rough-in | 5/14/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | P | PART |
|
|
Bob ###-####,penthouse ok to cover. rec'd complete resub. 5/14/2001 4:55:57 PM
|
BLD00-02394
| BLD-Concrete | 5/14/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | P | PART |
|
|
Special Inspection ###-#### 4th flr...need eng's ok , steel in place 5/14/2001 1:30:37 PM
|
BLD01-00896
| BLD-Foundation | 5/11/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/11/2001 at 15:54:12. Contact: ...1st lift...bar ok 5/14/2001 2:36:46 PM
|
BLD01-00990
| BLD-Final | 5/11/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | P | PASS |
|
|
megan-- fn occ, l/c only. 5/14/2001 2:22:53 PM
|
BLD00-03538
| BLD-Concrete | 5/10/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 10:59:39. Contact: . col's, walls, pending report. 5/14/2001 11:40:47 AM
|
BLD01-00896
| BLD-Foundation | 5/11/2001 | 5/14/2001 | 5/11/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 05/11/2001 at 08:37:03. Contact: . Disp set to [CANC] by a contractor via Hello! on 05/11/2001 at 15:52:53.
|