MIS01-00084
| BLD-Final | 5/11/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 406 On 5/11/2001 12:06:09 PM Reinsp OK for permanant occupancy 5/14/2001 10:05:00 AM
|
BLD01-00416
| FIRE-Final Inspection | 5/14/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | P | PASS |
|
|
Reinsp OK for permanant occupancy 5/14/2001 1:18:25 PM
|
FIR01-00317
| INSP-Sprinkler Rough-in | 5/14/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | P | PART |
|
|
###-#### OK to cover supply line and FDC piping 5/14/2001 3:06:10 PM
|
FIR01-00285
| INSP-Sprinkler Rough-in/Hydro | 5/14/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | P | PART |
|
|
OK to cover supply line for bldg's A & B 5/14/2001 2:21:13 PM 5/14/2001 Supply line for bldg's C & D was approved on 5/10/01 5/14/2001 2:32:34 PM
|
BLD00-02809
| FIRE-Conference | 5/11/2001 | 5/14/2001 | 5/14/2001 12:00:00 AM | P | PASS |
|
|
Tim ###-#### Conf with Gen contr about alarm system 5/14/2001 2:07:53 PM
|