Inspections for the day of: Monday, May 14, 2001.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02818 BLD-Final5/11/20015/14/20015/14/2001 12:00:00 AMAFAIL
bob frost ###-####
c/n posted, hand rail, s/c fire door, seal fire wall 5/14/2001 12:21:42 PM
BLD00-03388 BLD-Final5/11/20015/14/20015/14/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/11/2001 at 12:54:08. Contact: ###-####.c of c #20252 issued 5/14/2001 9:38:29 AM
BLD01-00672 BLD-Framing/Rough-in5/11/20015/14/20015/14/2001 12:00:00 AMAPART
shear wall todd ###-####
ext. shear ok 5/14/2001 8:44:08 AM
BLD01-00187 BLD-Concrete5/11/20015/14/20015/14/2001 12:00:00 AMAPART
###-#### wall
upper south retaining wall, ok pending s. i. report 5/14/2001 1:32:51 PM
MEC01-00911 Final5/11/20015/14/20015/14/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 05/11/2001 at 14:53:03. Contact: ###-####.
BLD00-02884 BLD-Framing/Rough-in5/11/20015/14/20015/14/2001 12:00:00 AMAPART
###-####
c/ n posted, ok to insulate 5/14/2001 11:47:41 AM
MEC01-01413 Pressure Test5/14/20015/14/20015/14/2001 12:00:00 AMAPASS
jan ###-####
MEC01-00826 Final5/14/20015/14/20015/14/2001 12:00:00 AMAPASS
Scheduled by Inspector: 415 On 5/14/2001 9:02:21 AM
BLD00-01736 BLD-Final5/14/20015/14/20015/14/2001 12:00:00 AMPNR
###-####
BLD00-02818 BLD-Final5/14/20015/14/20015/14/2001 12:00:00 AMPNR
5/14/2001 2:53:51 PM
BLD00-01683 BLD-Conference5/14/20015/14/20015/14/2001 12:00:00 AMPPART
Added by Inspector: 415 On 5/14/2001 1:51:23 PM ext. shear ok per eng. letter of approval as built
MEC01-01393 Final5/14/20015/14/20015/14/2001 12:00:00 AMPPART
dick ###-####
r/i ok, need gas finaled 5/14/2001 2:00:32 PM
BLD01-00225 BLD-Framing/Rough-in5/11/20015/14/20015/14/2001 12:00:00 AMPPART
masonary wall ###-####,bond beam ok w/ verbal corrections 5/15/2001 9:10:47 AM