Inspections for the day of: Tuesday, May 14, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00913 BLD-Framing/Rough-in5/13/20025/14/20025/14/2002 12:00:00 AMAPART
SHEER WALL PJ ###-#### Shear nailing OK..... Add retro fit HD to South end ....far North shear panel Gar front. 5/14/2002 12:55:12 PM
BLD02-00950 BLD-Footing5/13/20025/14/20025/14/2002 12:00:00 AMAPASS
###-#### EMANUEL Wall OK 5/14/2002 12:37:46 PM
BLD02-00963 BLD-Footing5/13/20025/14/20025/14/2002 12:00:00 AMAPASS
###-#### EMANUEL Wall OK 5/14/2002 12:37:57 PM
BLD02-00754 BLD-Framing/Rough-in5/13/20025/14/20025/14/2002 12:00:00 AMAFAIL
###-#### john C/N On site. 5/14/2002 1:25:18 PM
BLD02-00870 BLD-Framing/Rough-in5/13/20025/14/20025/14/2002 12:00:00 AMAPASS
###-#### john
BLD02-00860 BLD-Framing/Rough-in5/13/20025/14/20025/14/2002 12:00:00 AMAFAIL
###-#### john C/N posted. 5/14/2002 12:07:07 PM
BLD02-00639 BLD-Framing/Rough-in5/13/20025/14/20025/14/2002 12:00:00 AMPFAIL
###-#### john C/N on site. 5/14/2002 1:49:02 PM
BLD02-00861 BLD-Framing/Rough-in5/14/20025/14/20025/14/2002 12:00:00 AMPPASS
###-####
MEC02-01222 Rough-in5/13/20025/14/20025/14/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/13/2002 at 14:23:43. Contact: ###-####.
MEC02-01222 Pressure Test5/13/20025/14/20025/14/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/13/2002 at 14:23:56. Contact: ###-####.