BLD99-03382
| BLD-Aging Inspection | 5/12/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | | DONE |
|
|
roof...no further call. 5/14/2003 9:57:06 AM
|
BLD03-00052
| BLD-Aging Inspection | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | | PASS |
|
|
hvac ok, no elec insp yet... 5/14/2003 9:58:07 AM
|
BLD03-01073
| BLD-Conference | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | A | PASS |
|
|
Demo, WIP
|
MEC03-01056
| Pressure Test | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | A | NR |
|
|
unable to locate gage...house locked 5/14/2003 9:35:29 AM
|
MEC03-01218
| Final | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | A | CANC |
|
|
see history...unable to inspect, out of time.
|
BLD02-00370
| BLD-Framing/Rough-in | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 5/13/2003 at 1:39:39 PM. Contact: ###-####.
|
BLD02-00266
| BLD-Framing/Rough-in | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | A | PART |
|
|
dave, shaft ok...need other insps for final. 5/14/2003 11:21:59 AM
|
BLD03-00732
| BLD-Framing/Rough-in | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | A | PART |
|
|
###-####... add'n portion ok....stairs are for mech./crawl access only...ok to temp cover windows as they're back-ordered 5/14/2003 1:31:06 PM
|
BLD03-01038
| BLD-Final | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | A | DONE |
|
|
roof completed, visual insp only 5/14/2003 9:54:06 AM
|
MEC03-01218
| Final | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Sherri Petterson
|
MEC03-01056
| Pressure Test | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | NH |
|
|
new const...owner-builder; no gage visible ouse locked, called A-1... 5/14/2003 9:42:51 AM
|
BLD02-02596
| BLD-Conference | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | PASS |
|
|
Carl, call owner Eva, ###-####, keep c/n 5/14/2003 6:17:04 PM
|
BLD02-00199
| BLD-Footing | 5/7/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | PART |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore...east wall portion, mti onsite. 5/14/2003 2:58:06 PM
|
BLD02-01532
| BLD-Framing/Rough-in | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 5/13/2003 at 8:09:26 PM. Contact: ###-####.
|
MEC03-00978
| Final | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | NR |
|
|
need balance report & Ansul working at hood 5/14/2003 6:24:25 PM
|
MEC03-01199
| Final | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | NR |
|
|
need balance report, sprinklers 5/14/2003 6:26:05 PM
|
BLD02-00370
| BLD-Framing/Rough-in | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | PART |
|
|
need eng's review of SW penetrations...pipes, cols...WIP 5/14/2003 6:07:41 PM
|
BLD02-00266
| BLD-Final | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | PART |
|
|
Dave...###-#### c/n, occ load signs, door listings, misc finish, obtain other finals; ok for t/o except kitchen. 5/14/2003 6:31:24 PM obtain complete mech finals 5/14/2003 6:32:58 PM
|
BLD03-00732
| BLD-Energy code compliance | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | PART |
|
|
walls ok; need to complete window install.
|