BLD02-02435
| BLD-Framing/Rough-in | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | A | PART |
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara MooreLower floor area A ok left a c/n for the mechanical runing up 2nd floor to provide a 1 hr shaft etc. 5/14/2003 1:22:21 PM
|
BLD02-01373
| BLD-Conference | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | A | PART |
|
|
Need to meet with Jim at ###-#### call 1/2 hr prior./13/2003 5:00:38 PM 5/13/2003 5:02:28 PM. Myself and George met with builder and went over items of concern, there is a list posted on site, some items have been addressed from prior c/n. 5/14/2003 11:15:08 AM
|
BLD03-00624
| BLD-Conference | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | A | PART |
|
|
call clint 1/2hr prior. Will meet with George S and my self. ###-####. 5/13/2003 4:57:49 PM 5/13/2003 4:58:26 PM. My self and George met and discused the job with contractor, The approved plan shows only a floor plan and typical cross section, the construction has an 8 foot high wall with a raised shed roof above the top plate line, and has- I joist raftes, none of this shown on plans. The plans lack adequate details, They should have adequatly illustrated construction and code compliance, so that most of the corrections could have been avoided. I left a c/n to submit plans for as built, and noted items which should be addressed and posted this on window. 5/14/2003 11:13:22 AM
|
BLD03-00930
| BLD-Final | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | A | PART |
|
|
steve on sign; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD03-00294
| BLD-Conference | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | A | FAIL |
|
|
I was called out by sign company to inspect sign and noticed that this interior work has never had a framing inspection called for. I left a c/n on front window to call for inspection with approved plans to determine what needs to be done to resolve. 5/14/2003 9:33:08 AM
|
BLD03-00783
| BLD-Energy code compliance | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | PASS |
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD02-01373
| BLD-Conference | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | CANC |
|
|
changed to am. 5/13/2003 4:55:15 PM
|
MEC03-01213
| Rough-in | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/14/2003 at 7:42:53 AM. Contact: ###-####.
|
BLD03-00312
| BLD-Energy code compliance | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | FAIL |
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. posted c/n hook up all bathroom fans and vapor barrier in upper bathroom and lower florr front room areas. c/n posted at front window . 5/14/2003 4:11:29 PM
|
MEC03-00740
| Pressure Test | 5/14/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/14/2003 at 8:52:31 AM. Contact: ###-####.
|
BLD03-00251
| BLD-Final | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | PART |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara MooreOk temp oc told contractor to go obtain temp from office, a perm oc would be ok pending fire/life safety approval. 5/14/2003 2:45:42 PM
|
BLD03-00037
| BLD-Final | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | PART |
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Ok for temp oc, a perm oc could be given after fire /life safety approved. 5/14/2003 3:13:05 PM
|
BLD03-00104
| BLD-Energy code compliance | 5/13/2003 | 5/14/2003 | 5/14/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/13/2003 at 3:59:35 PM. Contact: ###-####.
|