Inspections for the day of: Monday, May 14, 2007.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00268 INSP-Final Inspection5/14/20075/14/20075/14/2007 4:36:00 PMPPASS
Permit finaled
BLD07-00771 FIRE-Final Inspection5/14/20075/14/20075/14/2007 4:04:45 PMPPASS
life safety passed
FIR07-00366 INSP-Final Inspection5/11/20075/14/20075/14/2007 4:00:20 PMAPASS
permit finaled
FIR07-00130 INSP-Sprinkler Rough-in/Hydro5/11/20075/14/20075/14/2007 1:02:04 PMAFAIL
The attic sprinkler system still does not match the approved plans with upright heads overspaced and too far from the deck and earthquake bracing missing. The third floor wet system hangers and tenting have been corrected. The second floor hangers have been corrected. The contractor stated that all of the plan deviations that I marked in red on the city approved plans were ok with Brian and no resubmittals required. I called Brian and he stated that was not the case. I left a correction notice with the fitter stating that resubmittals are required. I gave the fitter permission for only the second floor piping and the piping in the first floor resident rooms to be covered. All other piping is to remain uncovered until it matches the city approved plans or resubmittals are approved. The first floor and second floor hydro tests passed. The third floor hydro test failed. These floors had to be retested due to the main piping being the wrong size. I also aske the fitter for verification that the 3" sch 10 piping could be used incase the piping was submitted as plastic. The plans were not clear about this.
BLD06-03440 FIRE-Final Inspection5/11/20075/14/20075/14/2007 10:21:38 AMAPASS
life safety passed
FIR06-00536 INSP-Final Inspection5/11/20075/14/20075/14/2007 10:20:59 AMAPASS
permit finaled