Inspections for the day of: Wednesday, May 14, 2008.
Number of inspections: 13
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-03082 BLD-Framing/Rough-in5/13/20085/14/20085/15/2008 3:32:30 PMPPART
Art = ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt lower framing ok need all ri insp. will be back for insulation for this area.
ESC08-00258 Site Preparation5/14/20085/14/20085/14/2008 4:28:44 PMPPASS
BLD08-00683 BLD-Framing/Rough-in5/13/20085/14/20085/14/2008 4:28:20 PMPPASS
ben - please call 1/2 hr prior to inpsection Phone #: ###-####
ESC08-00145 Random Inspection5/14/20085/14/20085/14/2008 3:20:56 PMPPART
need to clean up concrete and sod next to drivway.
BLD08-00403 BLD-Final5/14/20085/14/20085/14/2008 3:17:33 PMPPASS
jim Note: please call 1/2 hr prior to inspection Phone #: ###-####
BLD08-00403 DOC - Permit Finaled5/14/20085/14/20085/14/2008 3:17:20 PMPPASS
BLD08-00947 BLD-Framing/Rough-in5/13/20085/14/20085/14/2008 2:50:38 PMAPART
alan Phone #: ###-#### need ele ri insp./ move bi-level switching/ ok to start gyp upon ele aproval/ call for reinsp to verift switching.
BLD08-00937 BLD-Framing/Rough-in5/14/20085/14/20085/14/2008 2:20:41 PMPPASS
BLD08-00937 DOC - Permit Finaled5/14/20085/14/20085/14/2008 2:20:28 PMPPASS
BLD08-00937 BLD-Final5/14/20085/14/20085/14/2008 2:20:19 PMPPASS
BLD08-00963 BLD-Footing5/13/20085/14/20085/14/2008 8:49:01 AMAPART
Scheduled by a contractor via Hello! on 5/13/2008 at 11:53:01 PM. Contact: ###-####.set backs ok
ESC08-00399 Site Preparation5/14/20085/14/20085/14/2008 8:48:26 AMAPASS
BLD07-03012 BLD-Final5/13/20085/14/2008 A