BLD08-00653
| FIRE-Conference | 5/14/2008 | 5/14/2008 | 5/14/2008 4:17:19 PM | P | CANC |
|
|
Wrong inspector called in.
|
FIR07-00874
| INSP-Sprinkler Rough-in/Hydro | 5/13/2008 | 5/14/2008 | 5/14/2008 4:14:00 PM | P | CANC |
|
|
Per stephen the dry system hydro test failed due to a dry pendant. Will be rescheduled.
|
FIR08-00254
| INSP-Final Inspection | 5/14/2008 | 5/14/2008 | 5/14/2008 3:45:46 PM | P | PASS |
|
|
Permit finaled
|
FIR07-01050
| INSP-Supply line flush | 5/14/2008 | 5/14/2008 | 5/14/2008 2:52:14 PM | P | PASS |
|
|
The underground flush passed.
|
FIR07-00697
| INSP-Sprinkler Rough-in/Hydro | 5/14/2008 | 5/14/2008 | 5/14/2008 2:51:26 PM | P | PASS |
|
|
The above ground hydro test passed.
|
FIR08-00254
| INSP-Sprinkler Rough-in/Hydro | 5/13/2008 | 5/14/2008 | 5/14/2008 2:50:46 PM | A | PASS |
|
|
rough-in passed
|
FIR08-00015
| INSP-Sprinkler Rough-in/Hydro | 5/13/2008 | 5/14/2008 | 5/14/2008 11:00:22 AM | A | PASS |
|
|
24 hr air test passed
|
FIR07-01013
| INSP-Sprinkler Rough-in/Hydro | 5/13/2008 | 5/14/2008 | 5/14/2008 10:59:01 AM | A | PASS |
|
|
24 hr air test passed
|
BLD08-00981
| FIRE-Final Inspection | 5/13/2008 | 5/14/2008 | 5/14/2008 10:01:42 AM | A | PART |
|
|
A temporary occupancy was given until the fire extinguisher is provided, the sticker at the main exit is provided, the cover is put on the electrical switch and the electrical wiring is repaired or removed.
|
BLD07-01957
| FIRE-Final Inspection | 5/13/2008 | 5/14/2008 | 5/14/2008 9:32:44 AM | A | FAIL |
|
|
There were no approved plans on site. Also the three existing exit signs were inoperative and need repaired or replaced.
|