BLD09-00105
| FIRE-Final Inspection | 5/13/2009 | 5/14/2009 | 5/14/2009 1:29:42 PM | A | FAIL |
|
|
Provide single action hardware on the restroom door, remove the deadbolt on the north west exit door, provide sticker at teh main exit door as discussed.
|
FIR06-00205
| INSP-Final Inspection | 5/13/2009 | 5/14/2009 | 5/14/2009 12:31:33 PM | A | PASS |
|
|
Permit finaled
|
FIR05-00861
| INSP-Final Inspection | 5/13/2009 | 5/14/2009 | 5/14/2009 12:31:15 PM | A | PASS |
|
|
Permit finaled
|
FIR05-00322
| INSP-Final Inspection | 5/13/2009 | 5/14/2009 | 5/14/2009 12:30:48 PM | A | PASS |
|
|
Permit finaled
|
BLD09-00427
| FIRE-Conference | 5/13/2009 | 5/14/2009 | 5/14/2009 10:07:10 AM | A | DONE |
|
|
I contacted Layton construction about the attached FIR permit. Per the BLD permit all of the work is on the third floor. The attached FIR is for work on the second floor that they are not a part of.
|
FIR08-00776
| INSP-Alarm Testing | 5/13/2009 | 5/14/2009 | 5/14/2009 10:05:40 AM | A | PASS |
|
|
Four smoke detectors and one manual pull station were tested. They are located in phase 5, sub phase 4 and 5. See the city approved plans with todays date and my name written at each device. Items tested ok.
|
BLD08-02589
| FIRE-Final Inspection | 5/13/2009 | 5/14/2009 | 5/14/2009 8:25:17 AM | A | FAIL |
|
|
Tried to contact Toby and left two voice messages. No inspection was perform and there was no access to the building.
|