ESC10-00008
| Site Preparation | 5/7/2010 | 5/14/2010 | 5/14/2010 3:18:43 PM | P | NR |
|
|
No field work started, but project sign has been posted. Will follow up next week.
|
ESC10-00325
| Site Preparation | 5/14/2010 | 5/14/2010 | 5/14/2010 2:43:20 PM | | PASS |
|
|
Sign posted, no concrete residual observed on the ground.
|
ESC10-00327
| Site Preparation | 5/14/2010 | 5/14/2010 | 5/14/2010 2:14:04 PM | | PART |
|
|
Sign not posted, , verbal to rp.
|
ESC10-00253
| General Inspection | 5/14/2010 | 5/14/2010 | 5/14/2010 2:12:40 PM | P | PART |
|
|
Met with RP, Brandon, pointed out misc. concrete piled on lot, containment washout area is required. As well, trash containment not on lot, observed misc. trash and construction debris. Complete clean up and containment.
|
ESC10-00271
| Site Preparation | 5/14/2010 | 5/14/2010 | 5/14/2010 1:48:51 PM | P | PART |
|
|
Verbal to RP, John: Sign is not posted, trash and construction debris not containerized, no washout. Complete all items by noon on Monday, re-inspection will take place by inspector 460 on Monday, May 17th after 12:00 noon.
|
ESC10-00388
| Site Preparation | 5/14/2010 | 5/14/2010 | 5/14/2010 10:26:43 AM | | PASS |
|
|
Sign posted, no signs of any potential problems. I mentioned options on proper non-stormwater washouts.
|
ESC10-00186
| Random Inspection | 5/14/2010 | 5/14/2010 | 5/14/2010 9:45:05 AM | P | PART |
|
|
Overall site looks ok, misc. minor controls could be better, e.x. repair construction fencing, other misc access controls could be put in place. Washout pit ok, trash management is ok.
|
ESC10-00386
| Site Preparation | 5/14/2010 | 5/14/2010 | 5/14/2010 9:01:12 AM | | NR |
|
|
Work has not started; Assigned site preparation inspection for inspector 460 for next week.
|
ESC05-00832
| Aging Inspection | 5/14/2010 | 5/14/2010 | 5/14/2010 8:31:41 AM | | DONE |
|
|
|
ESC05-00832
| DOC - Permit Finaled | 5/14/2010 | 5/14/2010 | 5/14/2010 8:31:26 AM | P | PASS |
|
|
|