Inspections for the day of: Monday, May 14, 2012.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00393 INSP-Final Inspection5/14/20125/14/20125/14/2012 3:58:15 PMPPASS
Permit finaled. Tim is mounting the map at the facp and providing me with the new version of NFPA 72 record of completion forms.
BLD12-00864 FIRE-Final Inspection5/11/20125/14/20125/14/2012 3:47:36 PMPPASS
Life safety passed. Taylor Brothers has re-certified the hood suppression system.
FIR12-00229 INSP-Sprinkler Rough-in/Hydro5/14/20125/14/20125/14/2012 3:44:40 PMPPASS
Overhead hydro test for the new piping passed. Witnessed gain in pressure. Piping can be covered.
FIR12-00227 INSP-Sprinkler Rough-in5/14/20125/14/20125/14/2012 3:35:29 PMPPASS
The sprinkler piping above the hardlids is ok for cover. Myself, Jeremy and the job superintendant discussed possible sprinklers being blocked by fixtures/valances. Jeremy is going to investigate. Another rough-in inspection will be required when the T-bar is installed. Upright sprinkler coverage will be required in the stock room. Bracing will be required for sprig ups over 4'.
FIR12-00202 INSP-Sprinkler Rough-in5/11/20125/14/20125/14/2012 2:57:54 PMAPASS
Stockroom area sprinkler piping ok to cover.
FIR12-00178 INSP-Sprinkler Rough-in5/11/20125/14/20125/14/2012 2:57:37 PMAPASS
Stockroom area sprinkler piping ok to cover.
BLD12-00483 FIRE-Final Inspection5/14/20125/14/20125/14/2012 2:28:02 PMPPASS
life safety passed
FIR12-00160 INSP-Final Inspection5/11/20125/14/20125/14/2012 9:39:53 AMAPASS
Permit finaled
FIR12-00172 INSP-Final Inspection5/11/20125/14/20125/14/2012 9:39:37 AMAPASS
Permit finaled