BLD11-02317
| FIRE-Final Inspection | 5/9/2013 | 5/14/2013 | 5/14/2013 6:09:49 PM | P | PART |
|
|
Completed walkthrough of work completed to date including the basement and 1st thru 4th floors. Refer to corrections list for items noted in need of adjustment, repair or provision.
|
FIR13-00068
| INSP-Sprinkler Rough-in | 5/13/2013 | 5/14/2013 | 5/14/2013 6:06:10 PM | P | PART |
|
|
Refer to clouded, initialed and dated locations on approved plan set for grid ceiling rooms and areas okayed for cover. Noted three missing uprights and one missing hanger above two rooms. Several areas now have grid ceilings where plans indicate open to structure. Painted upright heads will need to be replaced per NFPA 13 requirements.
|
BLD12-03321
| FIRE-Conference | 5/14/2013 | 5/14/2013 | 5/14/2013 6:00:10 PM | P | DONE |
|
|
Regarding project related FIR trade permit work.
|
FIR12-00550
| INSP-Sprinkler Rough-in/Hydro | 5/14/2013 | 5/14/2013 | 5/14/2013 5:59:18 PM | A | PART |
|
|
Phases one and two as indicated on approved plans okayed for cover.
|
FIR12-00551
| INSP-Final Inspection | 5/14/2013 | 5/14/2013 | 5/14/2013 5:58:28 PM | A | PART |
|
|
Final pending ceiling finishes
|