Inspections for the day of: Tuesday, May 14, 2013.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00200 INSP-Sprinkler Rough-in5/14/20135/14/20135/14/2013 3:32:16 PMPPASS
Insulation has been repaired. Piping can be covered.
BLD12-01449 FIRE-Conference5/14/20135/14/20135/14/2013 2:02:59 PMPDONE
Tammy was unsure of the permiting and inspection process so I went over it with her. I also performed a life safety inspection for her. I found that the actual floor plan does not match the city approved plans between the Dining area and the Classroom. Also several exit signs have not been installed. She also wants to request a temporary occupancy since the Gym and the restrooms have not been constructed yet. This Gym/restrooms will need the new alarm system extended into it when built. I deferred her to Scott for this request.
FIR12-00260 INSP-Final Inspection5/13/20135/14/20135/14/2013 1:59:40 PMAFAIL
All work has been completed, inspected and tested up to the existing south wall. The gym and related restrooms have not been costructed yet. Two smoke detectors were relocated as I waited. Will need as-builts showing the closets where additional smoke detectors had to be added.