MEC14-04599
| Conference | 5/8/2015 | 5/14/2015 | 5/15/2015 5:00:15 PM | A | PART |
|
|
11am met contractor on site with Troy and went over the project. Equipment manufacturers haven't approved installation with the exhauster. I talked with Sara Shaffer in planning about an exposed venting system and it sounds like there is an avenue for approval. Exhauster isn’t linked to the water heater at this time and fan appeared to running continuously. Contractor was considering a 90% furnace and electric water heater.
|
MEC15-02090
| Final | 5/14/2015 | 5/14/2015 | 5/14/2015 3:51:30 PM | P | NR |
|
|
This is a Flue Pressure test and Final Inspect. Our installers are installing today. Please go as late as possible. Install Mgr, Allen, Ph is ###-####. Phone #: ###-#### Inspection requested via web by Mary LaFayette not ready for a final this was just a flue test
|
MEC15-02090
| Pressure Test | 5/14/2015 | 5/14/2015 | 5/14/2015 3:50:43 PM | P | PASS |
|
|
This is a Flue Pressure test and Final Inspect. Our installers are installing today. Please go as late as possible. Install Mgr, Allen, Ph is ###-####. Phone #: ###-#### Inspection requested via web by Mary LaFayette 5# flue test ok
|
MEC15-02017
| Final | 5/12/2015 | 5/14/2015 | 5/14/2015 2:59:24 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC15-02094
| Final | 5/14/2015 | 5/14/2015 | 5/14/2015 2:49:07 PM | P | PASS |
|
|
Please be between 1-3 this afternoon with a call to Dave on way ###-####. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter
|
MEC15-02092
| Final | 5/14/2015 | 5/14/2015 | 5/14/2015 2:48:38 PM | P | PASS |
|
|
Please call Billy on way he will be home ###-####. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter
|
MEC15-02036
| Final | 5/12/2015 | 5/14/2015 | 5/14/2015 2:22:35 PM | P | PASS |
|
|
Please call Matt @ ###-#### prior to inspection. Thank you. Phone #: ###-#### Inspection requested via web by Rick Borg
|
PLM15-00958
| Final | 5/12/2015 | 5/14/2015 | 5/14/2015 2:12:58 PM | P | PASS |
|
|
Please call homeowner before showing up. Phone #: ###-#### Inspection requested via web by James Staley
|
MEC15-02033
| Final | 5/12/2015 | 5/14/2015 | 5/14/2015 2:10:31 PM | P | PASS |
|
|
Please give homeowner a call before showing up. Phone #: ###-#### Inspection requested via web by James Staley
|
MEC15-00654
| Final | 5/13/2015 | 5/14/2015 | 5/14/2015 1:18:53 PM | P | PASS |
|
|
Call an hour before // James Phone #: ###-####
|
MEC15-01494
| Pressure Test | 5/14/2015 | 5/14/2015 | 5/14/2015 12:34:04 PM | P | PASS |
|
|
Please call before coming to jobsite for pressuretest make it late afternoon THanks Rene Phone #: ###-#### Inspection requested via web by Rene Neumeyer 20# test ok
|
MEC15-01774
| Rough-in | 5/13/2015 | 5/14/2015 | 5/14/2015 9:33:01 AM | A | PART |
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER basenment mechanical room hydronic loop and second floor hydronic loop test ok
|
MEC14-04932
| Final | 5/13/2015 | 5/14/2015 | 5/14/2015 8:59:39 AM | A | PASS |
|
|
call rate or 30 minutes before for access 3532650 Inspection requested via web by william kerwin
|
MEC15-02046
| Final | 5/13/2015 | 5/14/2015 | 5/14/2015 8:48:32 AM | A | PASS |
|
|
Please be between 830-915 with a 20mins call ahead or if morning doesn''t work please be between 2-3 in the afternoon with 20mins heads up. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter
|